IAC logo
IAC Assessment: UM0063
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UM0063
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Michigan
Assessment Year 1996
Principal Product Paper products
NAICS n/a
SIC 2675 - Die-cut Paper And Board
Sales $10,000,000-$50,000,000
# of Employees 120
Plant Area (Sq.Ft.) 8,472
Annual Production 55,000,000 Units
Production Hrs. Annual 4,160
Location (State) MI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $73,056 730,657 kWh $0.10
Natural Gas $44,524 10,584 MMBtu $4.21
TOTAL ENERGY COSTS $131,629
RECOMMENDED SAVINGS* $32,197 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Water Disposal Solid Waste (non-haz) Electricity Usage Natural Gas Water Disposal Solid Waste (non-haz)
$ kWh $ MMBtu $ Tgal $ lb
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,475
Cost:
$2,470
$1,475 14,361 - - - - - - $1,475
14,361
kWh
-
-
MMBtu
-
-
Tgal
-
-
lb
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,356
Cost:
$14,031
$5,356 37,222 - - - - - - $5,356
37,222
kWh
-
-
MMBtu
-
-
Tgal
-
-
lb
03: 2.7442 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE Savings:
$18,800
Cost:
$4,000
- - $18,800 4,508 - - - - -
-
kWh
$18,800
4,508
MMBtu
-
-
Tgal
-
-
lb
04: 3.4115 RECOVER AND REUSE COOLING WATER Savings:
$2,035
Cost:
$780
- - - - $2,035 207,710 - - -
-
kWh
-
-
MMBtu
$2,035
207,710
Tgal
-
-
lb
05: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$4,531
Cost:
-
- - - - - - $4,531 530,400 -
-
kWh
-
-
MMBtu
-
-
Tgal
$4,531
530,400
lb
TOTAL RECOMMENDED Savings:
$32,197
Cost:
$21,281
$6,831 51,583 $18,800 4,508 $2,035 207,710 $4,531 530,400 $6,831
51,583
kWh
$18,800
4,508
MMBtu
$2,035
207,710
Tgal
$4,531
530,400
lb
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
MMBtu
-
-
Tgal
-
-
lb
Savings
Cost
$ kWh $ MMBtu $ Tgal $ lb
Electricity Usage Natural Gas Water Disposal Solid Waste (non-haz) Electricity Usage Natural Gas Water Disposal Solid Waste (non-haz)