IAC logo
IAC Assessment: UM0064
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UM0064
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Michigan
Assessment Year 1996
Principal Product Steel, Cold Roll Sheet, Strip and Bars
NAICS n/a
SIC 3316 - Cold Finishing Of Steel Shapes
Sales $10,000,000-$50,000,000
# of Employees 110
Plant Area (Sq.Ft.) 196,000
Annual Production 95,000 Tons
Production Hrs. Annual 7,488
Location (State) MI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $467,616 5,949,004 kWh $0.08
Electricity Demand $291,563 17,328 kW-months/year $16.83
Electricity Fees $(-281) - $ -
Natural Gas $63,789 17,004 MMBtu $3.75
TOTAL ENERGY COSTS $824,321
RECOMMENDED SAVINGS* $27,369 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz)
$ kWh $ kW-months/year $ MMBtu $ lb
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$557
Cost:
$400
$388 7,327 $169 12 - - - - $388
7,327
kWh
$169
12
kW-months/year
-
-
MMBtu
-
-
lb
02: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$13,487
Cost:
$7,548
- - $13,487 - - - - - -
-
kWh
$13,487
-
kW-months/year
-
-
MMBtu
-
-
lb
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,967
Cost:
$4,130
$2,870 22,567 $1,097 77 - - - - $2,870
22,567
kWh
$1,097
77
kW-months/year
-
-
MMBtu
-
-
lb
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$5,525
Cost:
$1,000
$3,843 72,392 $1,682 118 - - - - $3,843
72,392
kWh
$1,682
118
kW-months/year
-
-
MMBtu
-
-
lb
05: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$413
Cost:
$2,025
- - - - $413 110 - - -
-
kWh
-
-
kW-months/year
$413
110
MMBtu
-
-
lb
06: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$3,420
Cost:
$852
- - - - - - $3,420 4,300 -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$3,420
4,300
lb
TOTAL RECOMMENDED Savings:
$27,369
Cost:
$15,955
$7,101 102,286 $16,435 207 $413 110 $3,420 4,300 $7,101
102,286
kWh
$16,435
207
kW-months/year
$413
110
MMBtu
$3,420
4,300
lb
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz)