IAC logo
IAC Assessment: UM0094
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UM0094
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Michigan
Assessment Year 1997
Principal Product Agricultural Tillage Tools
NAICS n/a
SIC 3523 - Farm Machinery And Equipment
Sales $5,000,000-$10,000,000
# of Employees 63
Plant Area (Sq.Ft.) 113,862
Annual Production 5,000,000 Units
Production Hrs. Annual 3,854
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $200,745 4,040,152 kWh $0.05
Electricity Demand $86,517 22,140 kW-months/year $3.91
Electricity Fees $9,039 - $ -
Natural Gas $155,295 38,243 MMBtu $4.06
TOTAL ENERGY COSTS $453,196
RECOMMENDED SAVINGS* $67,883 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $19,580
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Primary Product Electricity Usage Electricity Demand Solid Waste (non-haz) Primary Product
$ kWh $ kW-months/year $ lb $ $
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$706
Cost:
$1,185
$377 8,499 $329 27 - - - - $377
8,499
kWh
$329
27
kW-months/year
-
-
lb
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,560
Cost:
$22,835
$1,336 30,481 $1,224 102 - - - - $1,336
30,481
kWh
$1,224
102
kW-months/year
-
-
lb
-
-
$
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,236
Cost:
$1,000
$667 5,275 $569 47 - - - - $667
5,275
kWh
$569
47
kW-months/year
-
-
lb
-
-
$
04: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$5,407
Cost:
$2,520
$2,527 76,788 $2,880 240 - - - - $2,527
76,788
kWh
$2,880
240
kW-months/year
-
-
lb
-
-
$
05: 2.2511 INSULATE BARE EQUIPMENT Savings:
$18,874
Cost:
$7,590
$18,874 1,248,535 - - - - - - $18,874
1,248,535
kWh
-
-
kW-months/year
-
-
lb
-
-
$
06: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$1,600
Cost:
-
- - - - $1,600 24,000 - - -
-
kWh
-
-
kW-months/year
$1,600
24,000
lb
-
-
$
07: 4.652 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES Savings:
$37,500
Cost:
$2,500
- - - - - - $37,500 - -
-
kWh
-
-
kW-months/year
-
-
lb
$37,500
-
$
TOTAL RECOMMENDED Savings:
$67,883
Cost:
$37,630
$23,781 1,369,578 $5,002 416 $1,600 24,000 $37,500 - $23,781
1,369,578
kWh
$5,002
416
kW-months/year
$1,600
24,000
lb
$37,500
-
$
TOTAL IMPLEMENTED Savings:
$19,580
Cost:
$8,775
$19,251 1,257,034 $329 27 - - - - $19,251
1,257,034
kWh
$329
27
kW-months/year
-
-
lb
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $
Electricity Usage Electricity Demand Solid Waste (non-haz) Primary Product Electricity Usage Electricity Demand Solid Waste (non-haz) Primary Product