Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Michigan |
---|---|
Assessment Year | 1998 |
Principal Product | Soft Trim Automotive |
NAICS | n/a |
SIC | 2396 - Automotive And Apparel Trimmings |
Sales | $10,000,000-$50,000,000 |
# of Employees | 70 |
Plant Area (Sq.Ft.) | 70,000 |
Annual Production | 6,500,000 Pieces |
Production Hrs. Annual | 4,080 |
Location (State) | MI |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $27,069 | 753,224 | kWh | $0.04 |
Electricity Demand | $31,963 | 4,848 | kW-months/year | $6.59 |
Electricity Fees | $498 | - | $ | - |
Natural Gas | $18,108 | 4,510 | MMBtu | $4.02 |
TOTAL ENERGY COSTS | $91,058 | |||
RECOMMENDED SAVINGS* | $37,945 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $37,945 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $249 Cost: $540 |
$131 | 3,810 | $118 | 16 | - | - | - | - | - | - |
$131 3,810 kWh |
$118 16 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $1,708 Cost: $8,483 |
$1,000 | 30,774 | $708 | 96 | - | - | - | - | - | - |
$1,000 30,774 kWh |
$708 96 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS |
Savings: $3,449 Cost: - |
$3,006 | 83,236 | $443 | 60 | - | - | - | - | - | - |
$3,006 83,236 kWh |
$443 60 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $801 Cost: $100 |
$749 | 2,345 | $52 | 7 | - | - | - | - | - | - |
$749 2,345 kWh |
$52 7 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS |
Savings: $8,468 Cost: $6,750 |
- | - | - | - | $8,468 | 2,188 | - | - | - | - |
- - kWh |
- - kW-months/year |
$8,468 2,188 MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS |
Savings: $13,420 Cost: $5,200 |
- | - | - | - | - | - | $13,420 | 268,800 | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$13,420 268,800 lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 3.1192 REDUCE SCRAP PRODUCTION |
Savings: $1,690 Cost: $500 |
- | - | - | - | - | - | $1,690 | 650 | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$1,690 650 lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 4.122 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS |
Savings: $8,160 Cost: $2,500 |
- | - | - | - | - | - | - | - | $8,160 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
$8,160 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $37,945 Cost: $24,073 |
$4,886 | 120,165 | $1,321 | 179 | $8,468 | 2,188 | $15,110 | 269,450 | $8,160 | - | $4,886 120,165 kWh |
$1,321 179 kW-months/year |
$8,468 2,188 MMBtu |
$15,110 269,450 lb |
$8,160 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $37,945 Cost: $24,073 |
$4,886 | 120,165 | $1,321 | 179 | $8,468 | 2,188 | $15,110 | 269,450 | $8,160 | - | $4,886 120,165 kWh |
$1,321 179 kW-months/year |
$8,468 2,188 MMBtu |
$15,110 269,450 lb |
$8,160 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Personnel Changes |