IAC Assessment: UM0104
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UM0104
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Michigan
Assessment Year 1998
Principal Product Soft Trim Automotive
NAICS n/a
SIC 2396 - Automotive And Apparel Trimmings
Sales $10,000,000-$50,000,000
# of Employees 70
Plant Area (Sq.Ft.) 70,000
Annual Production 6,500,000 Pieces
Production Hrs. Annual 4,080
Location (State) MI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $27,069 753,224 kWh $0.04
Electricity Demand $31,963 4,848 kW-months/year $6.59
Electricity Fees $498 - $ -
Natural Gas $18,108 4,510 MMBtu $4.02
TOTAL ENERGY COSTS $91,058
RECOMMENDED SAVINGS* $37,945 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $37,945
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ lb $ $
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$249
Cost:
$540
$131 3,810 $118 16 - - - - - - $131
3,810
kWh
$118
16
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,708
Cost:
$8,483
$1,000 30,774 $708 96 - - - - - - $1,000
30,774
kWh
$708
96
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
03: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$3,449
Cost:
-
$3,006 83,236 $443 60 - - - - - - $3,006
83,236
kWh
$443
60
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$801
Cost:
$100
$749 2,345 $52 7 - - - - - - $749
2,345
kWh
$52
7
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
05: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$8,468
Cost:
$6,750
- - - - $8,468 2,188 - - - - -
-
kWh
-
-
kW-months/year
$8,468
2,188
MMBtu
-
-
lb
-
-
$
06: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$13,420
Cost:
$5,200
- - - - - - $13,420 268,800 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$13,420
268,800
lb
-
-
$
07: 3.1192 REDUCE SCRAP PRODUCTION Savings:
$1,690
Cost:
$500
- - - - - - $1,690 650 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$1,690
650
lb
-
-
$
08: 4.122 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS Savings:
$8,160
Cost:
$2,500
- - - - - - - - $8,160 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$8,160
-
$
TOTAL RECOMMENDED Savings:
$37,945
Cost:
$24,073
$4,886 120,165 $1,321 179 $8,468 2,188 $15,110 269,450 $8,160 - $4,886
120,165
kWh
$1,321
179
kW-months/year
$8,468
2,188
MMBtu
$15,110
269,450
lb
$8,160
-
$
TOTAL IMPLEMENTED Savings:
$37,945
Cost:
$24,073
$4,886 120,165 $1,321 179 $8,468 2,188 $15,110 269,450 $8,160 - $4,886
120,165
kWh
$1,321
179
kW-months/year
$8,468
2,188
MMBtu
$15,110
269,450
lb
$8,160
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes