IAC logo
IAC Assessment: UM0115
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UM0115
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Michigan
Assessment Year 1998
Principal Product Super-abrasive Tipped Cutting Tools parts
NAICS n/a
SIC 3465 - Automotive Stampings
Sales $5,000,000-$10,000,000
# of Employees 56
Plant Area (Sq.Ft.) 48,500
Annual Production 150,000 Pieces
Production Hrs. Annual 5,863
Location (State) MI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $38,753 1,407,679 kWh $0.03
Electricity Demand $59,964 4,032 kW-months/year $14.87
Electricity Fees $2,766 - $ -
Natural Gas $5,945 1,491 MMBtu $3.99
TOTAL ENERGY COSTS $108,978
RECOMMENDED SAVINGS* $13,466 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $10,292
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz) Gaseous Waste Personnel Changes Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz) Gaseous Waste Personnel Changes
$ kWh $ kW-months/year $ $ $ lb $ lb $ $
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$204
Cost:
$303
$104 3,517 $100 7 - - - - - - - - $104
3,517
kWh
$100
7
kW-months/year
-
-
$
-
-
lb
-
-
lb
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,764
Cost:
$6,186
$1,054 34,584 $1,710 120 - - - - - - - - $1,054
34,584
kWh
$1,710
120
kW-months/year
-
-
$
-
-
lb
-
-
lb
-
-
$
03: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$888
Cost:
$804
- - - - $888 - - - - - - - -
-
kWh
-
-
kW-months/year
$888
-
$
-
-
lb
-
-
lb
-
-
$
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$410
Cost:
$600
$223 7,034 $187 10 - - - - - - - - $223
7,034
kWh
$187
10
kW-months/year
-
-
$
-
-
lb
-
-
lb
-
-
$
05: 3.5311 RECOVER AND REUSE WASTE MATERIAL Savings:
$1,040
Cost:
$500
- - - - - - $1,040 6,400 - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$1,040
6,400
lb
-
-
lb
-
-
$
06: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$510
Cost:
-
- - - - - - - - $510 1,250 - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
lb
$510
1,250
lb
-
-
$
07: 4.1220 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS Savings:
$7,650
Cost:
$1,500
- - - - - - - - - - $7,650 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
lb
-
-
lb
$7,650
-
$
TOTAL RECOMMENDED Savings:
$13,466
Cost:
$9,893
$1,381 45,135 $1,997 137 $888 - $1,040 6,400 $510 1,250 $7,650 - $1,381
45,135
kWh
$1,997
137
kW-months/year
$888
-
$
$1,040
6,400
lb
$510
1,250
lb
$7,650
-
$
TOTAL IMPLEMENTED Savings:
$10,292
Cost:
$3,107
$104 3,517 $100 7 $888 - $1,040 6,400 $510 1,250 $7,650 - $104
3,517
kWh
$100
7
kW-months/year
$888
-
$
$1,040
6,400
lb
$510
1,250
lb
$7,650
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ lb $ lb $ $
Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz) Gaseous Waste Personnel Changes Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz) Gaseous Waste Personnel Changes