IAC logo
IAC Assessment: UU0026
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UU0026
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Utah
Assessment Year 2002
Principal Product Silver Bullion
NAICS n/a
SIC 3339 - Primary Nonferrous Metals, Nec
Sales $5,000,000-$10,000,000
# of Employees 30
Plant Area (Sq.Ft.) 35,000
Annual Production 375,000 Pounds
Production Hrs. Annual 6,251
Location (State) UT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $21,672 812,760 kWh $0.03
Electricity Demand $34,283 337 kW-months/year $101.73
Electricity Fees $7,848 - $ -
Natural Gas $181,909 30,979 MMBtu $5.87
TOTAL ENERGY COSTS $251,808
RECOMMENDED SAVINGS* $52,895 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $1,573
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz)
$ kWh $ kW-months/year $ MMBtu $ lb
01: 2.1121 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING Savings:
$4,189
Cost:
-
- - - - $4,189 739 - - -
-
kWh
-
-
kW-months/year
$4,189
739
MMBtu
-
-
lb
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$31,788
Cost:
$2,667
$11,613 385,371 $20,175 2,293 - - - - $11,613
385,371
kWh
$20,175
2,293
kW-months/year
-
-
MMBtu
-
-
lb
03: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$1,573
Cost:
-
- - $1,573 180 - - - - -
-
kWh
$1,573
180
kW-months/year
-
-
MMBtu
-
-
lb
04: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$3,197
Cost:
$3,100
- - $3,197 366 - - - - -
-
kWh
$3,197
366
kW-months/year
-
-
MMBtu
-
-
lb
05: 2.1113 REDUCE COMBUSTION AIR FLOW TO OPTIMUM Savings:
$10,389
Cost:
$2,110
- - - - $10,389 1,781 - - -
-
kWh
-
-
kW-months/year
$10,389
1,781
MMBtu
-
-
lb
06: 2.1116 IMPROVE COMBUSTION CONTROL CAPABILITY Savings:
$260
Cost:
$1,200
- - - - $260 44 - - -
-
kWh
-
-
kW-months/year
$260
44
MMBtu
-
-
lb
07: 3.5311 RECOVER AND REUSE WASTE MATERIAL Savings:
$1,499
Cost:
-
- - - - - - $1,499 14,580 -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$1,499
14,580
lb
TOTAL RECOMMENDED Savings:
$52,895
Cost:
$9,077
$11,613 385,371 $24,945 2,839 $14,838 2,564 $1,499 14,580 $11,613
385,371
kWh
$24,945
2,839
kW-months/year
$14,838
2,564
MMBtu
$1,499
14,580
lb
TOTAL IMPLEMENTED Savings:
$1,573
Cost:
-
- - $1,573 180 - - - - -
-
kWh
$1,573
180
kW-months/year
-
-
MMBtu
-
-
lb
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz)