IAC logo
IAC Assessment: WI0029
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WI0029
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 1988
Principal Product AIR-COOLED ENGINES
NAICS n/a
SIC 3519 - Internal Combustion Engines, Nec
Sales $10,000,000-$50,000,000
# of Employees 300
Plant Area (Sq.Ft.) 0
Annual Production 22,000 Pieces
Production Hrs. Annual 2,125
Location (State) WI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $226,863 3,711,606 kWh $0.06
Natural Gas $177,844 36,328 MMBtu $4.90
TOTAL ENERGY COSTS $404,707
RECOMMENDED SAVINGS* $16,795 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $16,795
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.4312 IMPROVE LUBRICATION PRACTICES Savings:
$3,047
Cost:
-
$3,047 49,824 - - - - $3,047
49,824
kWh
-
-
MMBtu
-
-
$
02: 2.3132 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS Savings:
$5,565
Cost:
-
$5,565 - - - - - $5,565
-
kWh
-
-
MMBtu
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,218
Cost:
$1,926
$2,218 26,377 - - - - $2,218
26,377
kWh
-
-
MMBtu
-
-
$
04: 2.7226 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE Savings:
$1,933
Cost:
$5,000
$1,933 31,653 - - - - $1,933
31,653
kWh
-
-
MMBtu
-
-
$
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,461
Cost:
$1,400
- - $1,461 298 - - -
-
kWh
$1,461
298
MMBtu
-
-
$
06: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$2,571
Cost:
$500
- - $2,671 545 $(-100) - -
-
kWh
$2,671
545
MMBtu
$(-100)
-
$
TOTAL RECOMMENDED Savings:
$16,795
Cost:
$8,826
$12,763 107,854 $4,132 843 $(-100) - $12,763
107,854
kWh
$4,132
843
MMBtu
$(-100)
-
$
TOTAL IMPLEMENTED Savings:
$16,795
Cost:
$8,826
$12,763 107,854 $4,132 843 $(-100) - $12,763
107,854
kWh
$4,132
843
MMBtu
$(-100)
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes