Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 1990
Principal Product ALUMINUM & ZINC CASTINGS
NAICS n/a
SIC 3363 - Aluminum Die-castings
Sales $10,000,000-$50,000,000
# of Employees 90
Plant Area (Sq.Ft.) 0
Annual Production 2,500,000 Pieces
Production Hrs. Annual 4,250
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $316,958 4,213,365 kWh $0.08
Natural Gas $137,208 41,610 MMBtu $3.30
TOTAL ENERGY COSTS $454,166
RECOMMENDED SAVINGS* $29,093 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $5,023
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$23,340
Cost:
-
$25,740 - - - $(-2,400) - $25,740
-
kWh
-
-
MMBtu
$(-2,400)
-
$
02: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$2,910
Cost:
$2,000
$2,910 - - - - - $2,910
-
kWh
-
-
MMBtu
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$705
Cost:
$1,328
$705 9,379 - - - - $705
9,379
kWh
-
-
MMBtu
-
-
$
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$930
Cost:
$2,000
$930 12,309 - - - - $930
12,309
kWh
-
-
MMBtu
-
-
$
05: 2.6232 INSTALL SET-BACK TIMERS Savings:
$730
Cost:
$600
$730 9,672 - - - - $730
9,672
kWh
-
-
MMBtu
-
-
$
06: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$478
Cost:
$250
- - $478 145 - - -
-
kWh
$478
145
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$29,093
Cost:
$6,178
$31,015 31,360 $478 145 $(-2,400) - $31,015
31,360
kWh
$478
145
MMBtu
$(-2,400)
-
$
TOTAL IMPLEMENTED Savings:
$5,023
Cost:
$5,578
$4,545 21,688 $478 145 - - $4,545
21,688
kWh
$478
145
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes