Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 1990
Principal Product ALUMINUM CANS
NAICS n/a
SIC 3411 - Metal Cans
Sales $10,000,000-$50,000,000
# of Employees 240
Plant Area (Sq.Ft.) 0
Annual Production 975,000,000 Pieces
Production Hrs. Annual 8,400
Location (State) WI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $733,432 19,977,726 kWh $0.04
Natural Gas $434,048 124,328 MMBtu $3.49
TOTAL ENERGY COSTS $1,167,480
RECOMMENDED SAVINGS* $13,317 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $7,761
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$317
Cost:
$500
- - $367 105 $(-50) - -
-
kWh
$367
105
MMBtu
$(-50)
-
$
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$4,226
Cost:
$8,680
$4,226 115,182 - - - - $4,226
115,182
kWh
-
-
MMBtu
-
-
$
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$634
Cost:
$1,350
$634 17,292 - - - - $634
17,292
kWh
-
-
MMBtu
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,208
Cost:
$1,224
$1,208 33,411 - - - - $1,208
33,411
kWh
-
-
MMBtu
-
-
$
05: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$1,605
Cost:
-
- - $1,605 460 - - -
-
kWh
$1,605
460
MMBtu
-
-
$
06: 2.6232 INSTALL SET-BACK TIMERS Savings:
$1,304
Cost:
$1,000
$1,304 35,463 - - - - $1,304
35,463
kWh
-
-
MMBtu
-
-
$
07: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,254
Cost:
-
$1,254 34,291 - - - - $1,254
34,291
kWh
-
-
MMBtu
-
-
$
08: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$1,065
Cost:
$750
- - $1,065 305 - - -
-
kWh
$1,065
305
MMBtu
-
-
$
09: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$1,274
Cost:
$500
- - $1,274 365 - - -
-
kWh
$1,274
365
MMBtu
-
-
$
10: 2.1131 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC Savings:
$342
Cost:
$509
- - $342 98 - - -
-
kWh
$342
98
MMBtu
-
-
$
11: 2.6214 SHUT OFF PILOTS IN STANDBY EQUIPMENT Savings:
$88
Cost:
-
- - $88 25 - - -
-
kWh
$88
25
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$13,317
Cost:
$14,513
$8,626 235,639 $4,741 1,358 $(-50) - $8,626
235,639
kWh
$4,741
1,358
MMBtu
$(-50)
-
$
TOTAL IMPLEMENTED Savings:
$7,761
Cost:
$11,254
$6,068 165,885 $1,693 485 - - $6,068
165,885
kWh
$1,693
485
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes