IAC Assessment: WI0121
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WI0121
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 1991
Principal Product PAPER, TRANSPARENT TUBES
NAICS n/a
SIC 2655 - Fiber Cans, Drums & Similar Products
Sales $50,000,000-$100,000,000
# of Employees 200
Plant Area (Sq.Ft.) 0
Annual Production 50,100,000 Pieces
Production Hrs. Annual 4,125
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $108,936 1,409,730 kWh $0.08
Natural Gas $56,229 13,032 MMBtu $4.31
TOTAL ENERGY COSTS $165,165
RECOMMENDED SAVINGS* $18,830 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$5,296
Cost:
-
$6,016 - - - $(-720) - $6,016
-
kWh
-
-
MMBtu
$(-720)
-
$
02: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$3,875
Cost:
$14,296
$(-270) (-3,517) $4,145 962 - - $(-270)
(-3,517)
kWh
$4,145
962
MMBtu
-
-
$
03: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$2,832
Cost:
$10,000
$2,832 - - - - - $2,832
-
kWh
-
-
MMBtu
-
-
$
04: 2.3132 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS Savings:
$1,020
Cost:
$400
$1,020 - - - - - $1,020
-
kWh
-
-
MMBtu
-
-
$
05: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$1,204
Cost:
-
$1,204 15,533 - - - - $1,204
15,533
kWh
-
-
MMBtu
-
-
$
06: 2.6124 ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE Savings:
$505
Cost:
$400
$505 6,448 - - - - $505
6,448
kWh
-
-
MMBtu
-
-
$
07: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$672
Cost:
$1,280
$672 8,792 - - - - $672
8,792
kWh
-
-
MMBtu
-
-
$
08: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$134
Cost:
-
$134 1,758 - - - - $134
1,758
kWh
-
-
MMBtu
-
-
$
09: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$3,292
Cost:
$5,000
- - $3,292 764 - - -
-
kWh
$3,292
764
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$18,830
Cost:
$31,376
$12,113 29,014 $7,437 1,726 $(-720) - $12,113
29,014
kWh
$7,437
1,726
MMBtu
$(-720)
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes