Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 1992
Principal Product FINANCIAL PRINTING
NAICS n/a
SIC 2752 - Commercial Printing, Lithographic
Sales $5,000,000-$10,000,000
# of Employees 125
Plant Area (Sq.Ft.) 0
Annual Production 2,050 Tons
Production Hrs. Annual 7,200
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $212,581 2,829,426 kWh $0.08
Natural Gas $21,950 4,318 MMBtu $5.08
TOTAL ENERGY COSTS $234,531
RECOMMENDED SAVINGS* $20,287 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $15,886
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,294
Cost:
$24
$2,564 33,998 - - $(-270) - $2,564
33,998
kWh
-
-
MMBtu
$(-270)
-
$
02: 2.6232 INSTALL SET-BACK TIMERS Savings:
$1,243
Cost:
$200
$1,243 22,274 - - - - $1,243
22,274
kWh
-
-
MMBtu
-
-
$
03: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$1,150
Cost:
-
$1,150 15,240 - - - - $1,150
15,240
kWh
-
-
MMBtu
-
-
$
04: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$2,130
Cost:
$200
- - $2,130 420 - - -
-
kWh
$2,130
420
MMBtu
-
-
$
05: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$2,093
Cost:
$700
- - $2,093 412 - - -
-
kWh
$2,093
412
MMBtu
-
-
$
06: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$1,121
Cost:
-
$1,121 14,947 - - - - $1,121
14,947
kWh
-
-
MMBtu
-
-
$
07: 2.6121 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED Savings:
$841
Cost:
-
$841 10,844 - - - - $841
10,844
kWh
-
-
MMBtu
-
-
$
08: 2.3132 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS Savings:
$640
Cost:
-
$640 - - - - - $640
-
kWh
-
-
MMBtu
-
-
$
09: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$486
Cost:
$500
- - $486 96 - - -
-
kWh
$486
96
MMBtu
-
-
$
10: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$8,289
Cost:
$19,976
$8,289 110,199 - - - - $8,289
110,199
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$20,287
Cost:
$21,600
$15,848 207,502 $4,709 928 $(-270) - $15,848
207,502
kWh
$4,709
928
MMBtu
$(-270)
-
$
TOTAL IMPLEMENTED Savings:
$15,886
Cost:
$21,400
$13,577 177,315 $2,579 508 $(-270) - $13,577
177,315
kWh
$2,579
508
MMBtu
$(-270)
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes