IAC logo
IAC Assessment: WI0140
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WI0140
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 1992
Principal Product ARCHITECTURAL WOOD
NAICS n/a
SIC 2541 - Wood Partitions And Fixtures
Sales $5,000,000-$10,000,000
# of Employees 60
Plant Area (Sq.Ft.) 0
Annual Production 0 Units
Production Hrs. Annual 2,125
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $77,229 686,401 kWh $0.11
Natural Gas $12,948 3,511 MMBtu $3.69
TOTAL ENERGY COSTS $90,177
RECOMMENDED SAVINGS* $5,326 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $258
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$2,542
Cost:
-
$2,542 - - - - - $2,542
-
kWh
-
-
MMBtu
-
-
$
02: 2.6232 INSTALL SET-BACK TIMERS Savings:
$230
Cost:
$400
$230 2,052 - - - - $230
2,052
kWh
-
-
MMBtu
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$63
Cost:
-
$91 879 - - $(-28) - $91
879
kWh
-
-
MMBtu
$(-28)
-
$
04: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$544
Cost:
-
$544 4,982 - - - - $544
4,982
kWh
-
-
MMBtu
-
-
$
05: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$258
Cost:
$800
- - $258 70 - - -
-
kWh
$258
70
MMBtu
-
-
$
06: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$482
Cost:
$500
- - $482 131 - - -
-
kWh
$482
131
MMBtu
-
-
$
07: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$109
Cost:
$500
- - $109 29 - - -
-
kWh
$109
29
MMBtu
-
-
$
08: 2.7226 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE Savings:
$365
Cost:
$700
$365 3,224 - - - - $365
3,224
kWh
-
-
MMBtu
-
-
$
09: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$278
Cost:
-
$278 2,345 - - - - $278
2,345
kWh
-
-
MMBtu
-
-
$
10: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$257
Cost:
$520
$257 2,345 - - - - $257
2,345
kWh
-
-
MMBtu
-
-
$
11: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$198
Cost:
$600
$198 1,758 - - - - $198
1,758
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$5,326
Cost:
$4,020
$4,505 17,585 $849 230 $(-28) - $4,505
17,585
kWh
$849
230
MMBtu
$(-28)
-
$
TOTAL IMPLEMENTED Savings:
$258
Cost:
$800
- - $258 70 - - -
-
kWh
$258
70
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes