IAC logo
IAC Assessment: WI0147
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WI0147
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 1992
Principal Product COOKIES AND CRACKERS
NAICS n/a
SIC 2052 - Cookies And Crackers
Sales $50,000,000-$100,000,000
# of Employees 390
Plant Area (Sq.Ft.) 0
Annual Production 54,000,000 Pounds
Production Hrs. Annual 5,525
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $448,812 6,551,290 kWh $0.07
Natural Gas $234,555 89,318 MMBtu $2.63
TOTAL ENERGY COSTS $683,367
RECOMMENDED SAVINGS* $22,983 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $2,068
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,588
Cost:
-
$5,420 79,132 - - $(-832) - $5,420
79,132
kWh
-
-
MMBtu
$(-832)
-
$
02: 2.3132 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS Savings:
$6,926
Cost:
$30,000
$6,926 - - - - - $6,926
-
kWh
-
-
MMBtu
-
-
$
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$3,906
Cost:
$2,140
$3,906 55,686 - - - - $3,906
55,686
kWh
-
-
MMBtu
-
-
$
04: 2.2525 ELIMINATE COOLING OF PROCESS STREAMS WHICH SUBSEQUENTLY MUST BE HEATED AND VICE VERSA Savings:
$2,665
Cost:
$200
$2,665 38,980 - - - - $2,665
38,980
kWh
-
-
MMBtu
-
-
$
05: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$1,513
Cost:
$500
- - $1,513 575 - - -
-
kWh
$1,513
575
MMBtu
-
-
$
06: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$1,444
Cost:
-
- - $1,444 549 - - -
-
kWh
$1,444
549
MMBtu
-
-
$
07: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$555
Cost:
$400
- - $555 211 - - -
-
kWh
$555
211
MMBtu
-
-
$
08: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,386
Cost:
$3,640
$1,386 20,223 - - - - $1,386
20,223
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$22,983
Cost:
$36,880
$20,303 194,021 $3,512 1,335 $(-832) - $20,303
194,021
kWh
$3,512
1,335
MMBtu
$(-832)
-
$
TOTAL IMPLEMENTED Savings:
$2,068
Cost:
$900
- - $2,068 786 - - -
-
kWh
$2,068
786
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes