IAC logo
IAC Assessment: WI0150
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WI0150
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 1992
Principal Product COMMERCIAL PRINTING
NAICS n/a
SIC 2752 - Commercial Printing, Lithographic
Sales $10,000,000-$50,000,000
# of Employees 225
Plant Area (Sq.Ft.) 0
Annual Production 0 Units
Production Hrs. Annual 6,600
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $385,908 5,058,910 kWh $0.08
Natural Gas $53,089 18,489 MMBtu $2.87
TOTAL ENERGY COSTS $438,997
RECOMMENDED SAVINGS* $75,110 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.7273 INSTALL DESICCANT HUMIDITY CONTROL SYSTEM Savings:
$51,435
Cost:
$27,000
$52,313 696,952 $(-878) (-306) - - $52,313
696,952
kWh
$(-878)
(-306)
MMBtu
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$7,318
Cost:
$10,089
$7,826 102,579 - - $(-508) - $7,826
102,579
kWh
-
-
MMBtu
$(-508)
-
$
03: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$2,493
Cost:
-
$2,493 32,825 - - - - $2,493
32,825
kWh
-
-
MMBtu
-
-
$
04: 2.6232 INSTALL SET-BACK TIMERS Savings:
$2,039
Cost:
$600
$2,039 26,671 - - - - $2,039
26,671
kWh
-
-
MMBtu
-
-
$
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$8,358
Cost:
-
$8,358 109,613 - - - - $8,358
109,613
kWh
-
-
MMBtu
-
-
$
06: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$1,658
Cost:
$5,000
- - $1,658 578 - - -
-
kWh
$1,658
578
MMBtu
-
-
$
07: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$424
Cost:
$500
- - $424 148 - - -
-
kWh
$424
148
MMBtu
-
-
$
08: 2.3135 SCHEDULE ROUTINE MAINTENANCE DURING NON-OPERATING PERIODS Savings:
$949
Cost:
-
$1,249 - - - $(-300) - $1,249
-
kWh
-
-
MMBtu
$(-300)
-
$
09: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$436
Cost:
$800
$436 5,862 - - - - $436
5,862
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$75,110
Cost:
$43,989
$74,714 974,502 $1,204 420 $(-808) - $74,714
974,502
kWh
$1,204
420
MMBtu
$(-808)
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes