IAC logo
IAC Assessment: WI0153
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WI0153
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 1992
Principal Product AUTOMOBILE DIE CAST PARTS
NAICS n/a
SIC 3363 - Aluminum Die-castings
Sales $10,000,000-$50,000,000
# of Employees 130
Plant Area (Sq.Ft.) 0
Annual Production 0 Units
Production Hrs. Annual 7,200
Location (State) WI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $303,443 6,484,467 kWh $0.05
Natural Gas $210,962 60,869 MMBtu $3.47
TOTAL ENERGY COSTS $514,405
RECOMMENDED SAVINGS* $35,687 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $5,209
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$19,612
Cost:
-
$11,911 - $7,701 - - - $11,911
-
kWh
$7,701
-
MMBtu
-
-
$
02: 2.2443 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR Savings:
$7,027
Cost:
$15,000
- - $7,027 2,049 - - -
-
kWh
$7,027
2,049
MMBtu
-
-
$
03: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$5,209
Cost:
$9,758
$5,209 - - - - - $5,209
-
kWh
-
-
MMBtu
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,569
Cost:
-
$2,121 41,618 - - $(-552) - $2,121
41,618
kWh
-
-
MMBtu
$(-552)
-
$
05: 2.6232 INSTALL SET-BACK TIMERS Savings:
$179
Cost:
$200
$179 4,103 - - - - $179
4,103
kWh
-
-
MMBtu
-
-
$
06: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,096
Cost:
$2,296
$1,096 24,326 - - - - $1,096
24,326
kWh
-
-
MMBtu
-
-
$
07: 2.2511 INSULATE BARE EQUIPMENT Savings:
$327
Cost:
$312
- - $327 95 - - -
-
kWh
$327
95
MMBtu
-
-
$
08: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$286
Cost:
-
- - $286 84 - - -
-
kWh
$286
84
MMBtu
-
-
$
09: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$271
Cost:
$600
- - $271 79 - - -
-
kWh
$271
79
MMBtu
-
-
$
10: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$111
Cost:
$250
$111 2,345 - - - - $111
2,345
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$35,687
Cost:
$28,416
$20,627 72,392 $15,612 2,307 $(-552) - $20,627
72,392
kWh
$15,612
2,307
MMBtu
$(-552)
-
$
TOTAL IMPLEMENTED Savings:
$5,209
Cost:
$9,758
$5,209 - - - - - $5,209
-
kWh
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes