IAC logo
IAC Assessment: WI0155
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WI0155
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 1992
Principal Product CLIPPERS AND BLADES
NAICS n/a
SIC 3423 - Hand And Edge Tools, Nec
Sales $10,000,000-$50,000,000
# of Employees 270
Plant Area (Sq.Ft.) 0
Annual Production 3,600,000 Pieces
Production Hrs. Annual 7,200
Location (State) WI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $75,537 1,178,195 kWh $0.06
Natural Gas $26,852 7,215 MMBtu $3.72
TOTAL ENERGY COSTS $102,389
RECOMMENDED SAVINGS* $9,453 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $1,747
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$395
Cost:
$5
$585 9,086 - - $(-190) - $585
9,086
kWh
-
-
MMBtu
$(-190)
-
$
02: 2.6232 INSTALL SET-BACK TIMERS Savings:
$370
Cost:
$400
$370 5,862 - - - - $370
5,862
kWh
-
-
MMBtu
-
-
$
03: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$1,747
Cost:
$500
- - $1,747 470 - - -
-
kWh
$1,747
470
MMBtu
-
-
$
04: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$1,583
Cost:
$2,800
$2,104 32,825 $(-521) (-140) - - $2,104
32,825
kWh
$(-521)
(-140)
MMBtu
-
-
$
05: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$1,483
Cost:
-
$1,577 - - - $(-94) - $1,577
-
kWh
-
-
MMBtu
$(-94)
-
$
06: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$844
Cost:
$2,000
- - $844 227 - - -
-
kWh
$844
227
MMBtu
-
-
$
07: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$381
Cost:
$1,280
$381 5,862 - - - - $381
5,862
kWh
-
-
MMBtu
-
-
$
08: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$349
Cost:
-
$349 5,569 - - - - $349
5,569
kWh
-
-
MMBtu
-
-
$
09: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$2,301
Cost:
-
$1,985 - $316 - - - $1,985
-
kWh
$316
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$9,453
Cost:
$6,985
$7,351 59,204 $2,386 557 $(-284) - $7,351
59,204
kWh
$2,386
557
MMBtu
$(-284)
-
$
TOTAL IMPLEMENTED Savings:
$1,747
Cost:
$500
- - $1,747 470 - - -
-
kWh
$1,747
470
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes