IAC logo
IAC Assessment: WI0272
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WI0272
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 1996
Principal Product Wood moulding, lumber/trim
NAICS n/a
SIC 2431 - Millwork
Sales $10,000,000-$50,000,000
# of Employees 55
Plant Area (Sq.Ft.) 76,000
Annual Production 1,000,000 Thousand Feet
Production Hrs. Annual 4,362
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $84,235 996,483 kWh $0.08
Electricity Demand $44,453 3,657 kW-months/year $12.16
Electricity Fees $(-977) - $ -
Natural Gas $9,482 2,969 MMBtu $3.19
TOTAL ENERGY COSTS $137,193
RECOMMENDED SAVINGS* $10,185 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $1,480
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz)
$ kWh $ kW-months/year $ MMBtu $ lb
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$3,159
Cost:
$13,000
$3,159 80,891 - - - - - - $3,159
80,891
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,696
Cost:
$5,280
$892 22,860 $804 63 - - - - $892
22,860
kWh
$804
63
kW-months/year
-
-
MMBtu
-
-
lb
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$414
Cost:
$683
$200 4,982 $214 17 - - - - $200
4,982
kWh
$214
17
kW-months/year
-
-
MMBtu
-
-
lb
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,511
Cost:
$960
$756 19,343 $755 59 - - - - $756
19,343
kWh
$755
59
kW-months/year
-
-
MMBtu
-
-
lb
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$251
Cost:
-
$113 2,931 $138 11 - - - - $113
2,931
kWh
$138
11
kW-months/year
-
-
MMBtu
-
-
lb
06: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$1,500
Cost:
-
- - - - - - $1,500 500 -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$1,500
500
lb
07: 2.3134 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION Savings:
$815
Cost:
-
- - $815 67 - - - - -
-
kWh
$815
67
kW-months/year
-
-
MMBtu
-
-
lb
08: 2.1132 REPAIR FAULTY LOUVERS AND DAMPERS Savings:
$628
Cost:
$1,100
- - - - $628 197 - - -
-
kWh
-
-
kW-months/year
$628
197
MMBtu
-
-
lb
09: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$211
Cost:
$200
- - - - $211 66 - - -
-
kWh
-
-
kW-months/year
$211
66
MMBtu
-
-
lb
TOTAL RECOMMENDED Savings:
$10,185
Cost:
$21,223
$5,120 131,007 $2,726 217 $839 263 $1,500 500 $5,120
131,007
kWh
$2,726
217
kW-months/year
$839
263
MMBtu
$1,500
500
lb
TOTAL IMPLEMENTED Savings:
$1,480
Cost:
$683
$313 7,913 $1,167 95 - - - - $313
7,913
kWh
$1,167
95
kW-months/year
-
-
MMBtu
-
-
lb
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz)