IAC Assessment: WI0281
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WI0281
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 1996
Principal Product Steel Tubing
NAICS n/a
SIC 3317 - Steel Pipe And Tubes
Sales $10,000,000-$50,000,000
# of Employees 95
Plant Area (Sq.Ft.) 431,235
Annual Production 110,000 Tons
Production Hrs. Annual 7,200
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $367,150 9,856,389 kWh $0.04
Electricity Demand $368,767 26,989 kW-months/year $13.66
Electricity Fees $34,119 - $ -
Natural Gas $168,635 36,070 MMBtu $4.68
TOTAL ENERGY COSTS $991,105
RECOMMENDED SAVINGS* $133,219 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $18,332
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz) Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz)
$ kWh $ kW-months/year $ MMBtu $ Tgal $ lb
01: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$33,184
Cost:
$80,000
$(-5,866) (-150,059) - - $39,050 8,344 - - - - $(-5,866)
(-150,059)
kWh
-
-
kW-months/year
$39,050
8,344
MMBtu
-
-
Tgal
-
-
lb
02: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$30,144
Cost:
$12,950
$26,604 680,539 $20,922 1,458 $(-17,382) (-3,714) - - - - $26,604
680,539
kWh
$20,922
1,458
kW-months/year
$(-17,382)
(-3,714)
MMBtu
-
-
Tgal
-
-
lb
03: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$19,250
Cost:
-
- - $19,250 1,343 - - - - - - -
-
kWh
$19,250
1,343
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
04: 3.4114 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER Savings:
$19,457
Cost:
$15,000
$1,167 29,894 - - - - $18,290 10,758,755 - - $1,167
29,894
kWh
-
-
kW-months/year
-
-
MMBtu
$18,290
10,758,755
Tgal
-
-
lb
05: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$11,051
Cost:
$26,220
$(-2,493) (-63,892) - - $13,544 2,894 - - - - $(-2,493)
(-63,892)
kWh
-
-
kW-months/year
$13,544
2,894
MMBtu
-
-
Tgal
-
-
lb
06: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$8,879
Cost:
-
- - - - - - - - $8,879 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
$8,879
-
lb
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$6,899
Cost:
$210
$4,729 121,043 $2,170 151 - - - - - - $4,729
121,043
kWh
$2,170
151
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
08: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$870
Cost:
$740
$306 7,913 $564 39 - - - - - - $306
7,913
kWh
$564
39
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
09: 2.1123 INSTALL AUTOMATIC STACK DAMPER Savings:
$931
Cost:
$1,100
- - - - $931 199 - - - - -
-
kWh
-
-
kW-months/year
$931
199
MMBtu
-
-
Tgal
-
-
lb
10: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,554
Cost:
$701
$1,745 44,549 $809 56 - - - - - - $1,745
44,549
kWh
$809
56
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
TOTAL RECOMMENDED Savings:
$133,219
Cost:
$136,921
$26,192 669,987 $43,715 3,047 $36,143 7,723 $18,290 10,758,755 $8,879 - $26,192
669,987
kWh
$43,715
3,047
kW-months/year
$36,143
7,723
MMBtu
$18,290
10,758,755
Tgal
$8,879
-
lb
TOTAL IMPLEMENTED Savings:
$18,332
Cost:
$911
$6,474 165,592 $2,979 207 - - - - $8,879 - $6,474
165,592
kWh
$2,979
207
kW-months/year
-
-
MMBtu
-
-
Tgal
$8,879
-
lb
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ lb
Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz) Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz)