Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Wisconsin, Milwaukee |
---|---|
Assessment Year | 1997 |
Principal Product | Water treatment equipment |
NAICS | n/a |
SIC | 3589 - Service Industry Machinery, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 301 |
Plant Area (Sq.Ft.) | 207,500 |
Annual Production | 100 Pieces |
Production Hrs. Annual | 4,250 |
Location (State) | WI |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $189,455 | 4,388,335 | kWh | $0.04 |
Electricity Demand | $68,992 | 9,150 | kW-months/year | $7.54 |
Electricity Fees | $14,785 | - | $ | - |
Natural Gas | $119,604 | 39,929 | MMBtu | $3.00 |
TOTAL ENERGY COSTS | $422,229 | |||
RECOMMENDED SAVINGS* | $118,007 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Solid Waste (non-haz) | Solid Waste (haz) | Personnel Changes | Primary Raw Material | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Solid Waste (non-haz) | Solid Waste (haz) | Personnel Changes | Primary Raw Material | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | lb | $ | lb | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 3.2123 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS |
Savings: $29,011 Cost: $1,000 |
- | - | - | - | - | - | - | - | - | - | $3,481 | 425 | - | - | $25,530 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - lb |
$3,481 425 lb |
- - $ |
$25,530 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7314 REDUCE VENTILATION AIR |
Savings: $6,908 Cost: $1,000 |
$321 | 12,309 | - | - | $6,587 | 1,709 | - | - | - | - | - | - | - | - | - | - |
$321 12,309 kWh |
- - kW-months/year |
$6,587 1,709 MMBtu |
- - Tgal |
- - lb |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 3.8122 USE TIGHT-FITTING LIDS ON MATERIAL CONTAINERS TO REDUCE VOC EMISSIONS |
Savings: $2,999 Cost: $1,000 |
- | - | - | - | - | - | - | - | - | - | - | - | $750 | - | $2,249 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - lb |
- - lb |
$750 - $ |
$2,249 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS |
Savings: $2,138 Cost: $5,000 |
- | - | - | - | - | - | - | - | - | - | $2,138 | - | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - lb |
$2,138 - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.3134 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION |
Savings: $26,499 Cost: - |
- | - | $27,899 | 3,522 | - | - | - | - | - | - | - | - | $(-1,400) | - | - | - |
- - kWh |
$27,899 3,522 kW-months/year |
- - MMBtu |
- - Tgal |
- - lb |
- - lb |
$(-1,400) - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL |
Savings: $19,520 Cost: $88,000 |
- | - | - | - | $4,520 | 1,561 | - | - | - | - | - | - | $15,000 | - | - | - |
- - kWh |
- - kW-months/year |
$4,520 1,561 MMBtu |
- - Tgal |
- - lb |
- - lb |
$15,000 - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.2621 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE |
Savings: $6,085 Cost: $15,000 |
$3,947 | 152,989 | $2,138 | 270 | - | - | - | - | - | - | - | - | - | - | - | - |
$3,947 152,989 kWh |
$2,138 270 kW-months/year |
- - MMBtu |
- - Tgal |
- - lb |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7251 REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF |
Savings: $2,230 Cost: $10,230 |
$3,034 | 117,526 | $2,911 | 367 | - | - | $(-3,715) | 864,000 | - | - | - | - | - | - | - | - |
$3,034 117,526 kWh |
$2,911 367 kW-months/year |
- - MMBtu |
$(-3,715) 864,000 Tgal |
- - lb |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS |
Savings: $18,978 Cost: $3,600 |
- | - | - | - | $18,978 | 6,326 | - | - | - | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$18,978 6,326 MMBtu |
- - Tgal |
- - lb |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $1,310 Cost: $210 |
$794 | 30,774 | $516 | 65 | - | - | - | - | - | - | - | - | - | - | - | - |
$794 30,774 kWh |
$516 65 kW-months/year |
- - MMBtu |
- - Tgal |
- - lb |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 3.4151 MINIMIZE WATER USAGE |
Savings: $274 Cost: - |
- | - | - | - | - | - | $274 | 63,750 | - | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$274 63,750 Tgal |
- - lb |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER |
Savings: $953 Cost: - |
- | - | - | - | - | - | - | - | $953 | 264 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
$953 264 lb |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
13: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $575 Cost: $450 |
$575 | 22,274 | - | - | - | - | - | - | - | - | - | - | - | - | - | - |
$575 22,274 kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - lb |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
14: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $527 Cost: $328 |
$318 | 12,309 | $209 | 26 | - | - | - | - | - | - | - | - | - | - | - | - |
$318 12,309 kWh |
$209 26 kW-months/year |
- - MMBtu |
- - Tgal |
- - lb |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $118,007 Cost: $125,818 |
$8,989 | 348,181 | $33,673 | 4,250 | $30,085 | 9,596 | $(-3,441) | 927,750 | $953 | 264 | $5,619 | 425 | $14,350 | - | $27,779 | - | $8,989 348,181 kWh |
$33,673 4,250 kW-months/year |
$30,085 9,596 MMBtu |
$(-3,441) 927,750 Tgal |
$953 264 lb |
$5,619 425 lb |
$14,350 - $ |
$27,779 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - lb |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | lb | $ | lb | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Solid Waste (non-haz) | Solid Waste (haz) | Personnel Changes | Primary Raw Material | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Solid Waste (non-haz) | Solid Waste (haz) | Personnel Changes | Primary Raw Material |