IAC logo
IAC Assessment: WI0288
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WI0288
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 1997
Principal Product Display Fixtures
NAICS n/a
SIC 2541 - Wood Partitions And Fixtures
Sales $10,000,000-$50,000,000
# of Employees 120
Plant Area (Sq.Ft.) 105,000
Annual Production 600 Units
Production Hrs. Annual 4,500
Location (State) WI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $38,910 1,361,665 kWh $0.03
Electricity Demand $38,584 4,391 kW-months/year $8.79
Electricity Fees $219 - $ -
Natural Gas $36,514 7,623 MMBtu $4.79
TOTAL ENERGY COSTS $167,214
RECOMMENDED SAVINGS* $12,803 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $8,816
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Other Liquid (haz) Solid Waste (non-haz) Personnel Changes Administrative Changes Electricity Usage Electricity Demand Other Liquid (haz) Solid Waste (non-haz) Personnel Changes Administrative Changes
$ kWh $ kW-months/year $ gal $ lb $ $ $ $
01: 2.8113 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER Savings:
$5,567
Cost:
$500
- - - - - - - - - - $5,567 - -
-
kWh
-
-
kW-months/year
-
-
gal
-
-
lb
-
-
$
$5,567
-
$
02: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$2,058
Cost:
-
- - - - - - $2,058 - - - - - -
-
kWh
-
-
kW-months/year
-
-
gal
$2,058
-
lb
-
-
$
-
-
$
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$1,683
Cost:
$7,800
$1,683 55,686 - - - - - - - - - - $1,683
55,686
kWh
-
-
kW-months/year
-
-
gal
-
-
lb
-
-
$
-
-
$
04: 3.8122 USE TIGHT-FITTING LIDS ON MATERIAL CONTAINERS TO REDUCE VOC EMISSIONS Savings:
$1,240
Cost:
$1,000
- - - - $115 27 - - $1,125 - - - -
-
kWh
-
-
kW-months/year
$115
27
gal
-
-
lb
$1,125
-
$
-
-
$
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,064
Cost:
$640
$632 21,102 $432 47 - - - - - - - - $632
21,102
kWh
$432
47
kW-months/year
-
-
gal
-
-
lb
-
-
$
-
-
$
06: 2.3132 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS Savings:
$1,008
Cost:
$5,000
- - $1,008 97 - - - - - - - - -
-
kWh
$1,008
97
kW-months/year
-
-
gal
-
-
lb
-
-
$
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$183
Cost:
$455
$83 2,931 $100 11 - - - - - - - - $83
2,931
kWh
$100
11
kW-months/year
-
-
gal
-
-
lb
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$12,803
Cost:
$15,395
$2,398 79,719 $1,540 155 $115 27 $2,058 - $1,125 - $5,567 - $2,398
79,719
kWh
$1,540
155
kW-months/year
$115
27
gal
$2,058
-
lb
$1,125
-
$
$5,567
-
$
TOTAL IMPLEMENTED Savings:
$8,816
Cost:
$5,955
$83 2,931 $1,108 108 - - $2,058 - - - $5,567 - $83
2,931
kWh
$1,108
108
kW-months/year
-
-
gal
$2,058
-
lb
-
-
$
$5,567
-
$
Savings
Cost
$ kWh $ kW-months/year $ gal $ lb $ $ $ $