IAC Assessment: WI0292
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WI0292
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 1997
Principal Product Bus and Truck Seats
NAICS n/a
SIC 3393 -
Sales $10,000,000-$50,000,000
# of Employees 210
Plant Area (Sq.Ft.) 75,000
Annual Production 162,500 Pieces
Production Hrs. Annual 4,375
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $31,337 790,152 kWh $0.04
Electricity Demand $39,146 3,026 kW-months/year $12.94
Electricity Fees $4,615 - $ -
Natural Gas $36,950 7,934 MMBtu $4.66
TOTAL ENERGY COSTS $122,512
RECOMMENDED SAVINGS* $32,651 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $15,195
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Primary Raw Material Electricity Usage Electricity Demand Natural Gas Personnel Changes Primary Raw Material
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 3.2123 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS Savings:
$15,413
Cost:
$3,500
- - - - - - - - $15,413 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$15,413
-
$
02: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$15,195
Cost:
$2,297
- - - - $15,195 3,261 - - - - -
-
kWh
-
-
kW-months/year
$15,195
3,261
MMBtu
-
-
$
-
-
$
03: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$1,007
Cost:
-
- - $1,020 75 - - $(-13) - - - -
-
kWh
$1,020
75
kW-months/year
-
-
MMBtu
$(-13)
-
$
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$416
Cost:
$610
$218 5,275 $198 14 - - - - - - $218
5,275
kWh
$198
14
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$366
Cost:
$1,280
$201 4,689 $165 12 - - - - - - $201
4,689
kWh
$165
12
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
06: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$254
Cost:
-
$130 3,224 $124 9 - - - - - - $130
3,224
kWh
$124
9
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$32,651
Cost:
$7,687
$549 13,188 $1,507 110 $15,195 3,261 $(-13) - $15,413 - $549
13,188
kWh
$1,507
110
kW-months/year
$15,195
3,261
MMBtu
$(-13)
-
$
$15,413
-
$
TOTAL IMPLEMENTED Savings:
$15,195
Cost:
$2,297
- - - - $15,195 3,261 - - - - -
-
kWh
-
-
kW-months/year
$15,195
3,261
MMBtu
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Primary Raw Material Electricity Usage Electricity Demand Natural Gas Personnel Changes Primary Raw Material