IAC logo
IAC Assessment: WI0323
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WI0323
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 1998
Principal Product Photographic Printing
NAICS n/a
SIC 3993 - Signs And Advertising Specialities
Sales $10,000,000-$50,000,000
# of Employees 105
Plant Area (Sq.Ft.) 180,000
Annual Production 0 Units
Production Hrs. Annual 6,400
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $56,979 1,423,798 kWh $0.04
Electricity Demand $33,362 2,496 kW-months/year $13.37
Electricity Fees $3,929 - $ -
Natural Gas $9,443 1,895 MMBtu $4.98
TOTAL ENERGY COSTS $120,857
RECOMMENDED SAVINGS* $12,530 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $3,449
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Water Disposal Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Water Disposal Administrative Changes Ancillary Material Cost
$ kWh $ kW-months/year $ Tgal $ $ $ $
01: 3.4113 TREAT AND REUSE RINSE WATERS Savings:
$6,555
Cost:
$1,475
- - - - $6,915 3,645,000 - - $(-360) - -
-
kWh
-
-
kW-months/year
$6,915
3,645,000
Tgal
-
-
$
$(-360)
-
$
02: 2.3135 SCHEDULE ROUTINE MAINTENANCE DURING NON-OPERATING PERIODS Savings:
$2,629
Cost:
-
- - $2,629 186 - - - - - - -
-
kWh
$2,629
186
kW-months/year
-
-
Tgal
-
-
$
-
-
$
03: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$2,343
Cost:
$600
$2,343 55,393 - - - - - - - - $2,343
55,393
kWh
-
-
kW-months/year
-
-
Tgal
-
-
$
-
-
$
04: 4.821 PAY BILLS ON TIME TO AVOID LATE FEES Savings:
$820
Cost:
-
- - - - - - $820 - - - -
-
kWh
-
-
kW-months/year
-
-
Tgal
$820
-
$
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$183
Cost:
$468
$137 3,224 $46 3 - - - - - - $137
3,224
kWh
$46
3
kW-months/year
-
-
Tgal
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$12,530
Cost:
$2,543
$2,480 58,617 $2,675 189 $6,915 3,645,000 $820 - $(-360) - $2,480
58,617
kWh
$2,675
189
kW-months/year
$6,915
3,645,000
Tgal
$820
-
$
$(-360)
-
$
TOTAL IMPLEMENTED Savings:
$3,449
Cost:
-
- - $2,629 186 - - $820 - - - -
-
kWh
$2,629
186
kW-months/year
-
-
Tgal
$820
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ Tgal $ $ $ $
Electricity Usage Electricity Demand Water Disposal Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Water Disposal Administrative Changes Ancillary Material Cost