Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Wisconsin, Milwaukee |
---|---|
Assessment Year | 1999 |
Principal Product | Metal Rolled Products |
NAICS | n/a |
SIC | 3499 - Fabricated Metal Products, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 75 |
Plant Area (Sq.Ft.) | 60,000 |
Annual Production | 100,000,000 Pounds |
Production Hrs. Annual | 4,850 |
Location (State) | IL |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $27,760 | 719,519 | kWh | $0.04 |
Electricity Demand | $30,649 | 2,495 | kW-months/year | $12.28 |
Electricity Fees | $7,549 | - | $ | - |
Natural Gas | $23,081 | 5,826 | MMBtu | $3.96 |
TOTAL ENERGY COSTS | $22,486 | |||
RECOMMENDED SAVINGS* | $49,691 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $30,096 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Water Disposal | Solid Waste (non-haz) | Personnel Changes | Administrative Changes | Increase in Production | Electricity Usage | Electricity Demand | Water Disposal | Solid Waste (non-haz) | Personnel Changes | Administrative Changes | Increase in Production | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | Tgal | $ | lb | $ | $ | $ | $ | $ | % | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 4.452 ELIMINATE SHIFT |
Savings: $28,000 Cost: $40,000 |
- | - | - | - | - | - | - | - | $28,000 | - | - | - | - | - |
- - kWh |
- - kW-months/year |
- - Tgal |
- - lb |
$28,000 - $ |
- - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS |
Savings: $13,083 Cost: - |
- | - | $13,083 | 970 | - | - | - | - | - | - | - | - | - | - |
- - kWh |
$13,083 970 kW-months/year |
- - Tgal |
- - lb |
- - $ |
- - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 3.4114 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER |
Savings: $4,913 Cost: $18,000 |
$(-377) | (-8,792) | $(-323) | (-24) | $6,113 | 3,159,000 | - | - | $(-500) | - | - | - | - | - |
$(-377) (-8,792) kWh |
$(-323) (-24) kW-months/year |
$6,113 3,159,000 Tgal |
- - lb |
$(-500) - $ |
- - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 4.611 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE |
Savings: $1,867 Cost: $4,200 |
$207 | 4,982 | - | - | - | - | - | - | $(-840) | - | - | - | $2,500 | - |
$207 4,982 kWh |
- - kW-months/year |
- - Tgal |
- - lb |
$(-840) - $ |
- - $ |
$2,500 - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 3.7131 USE A RAG RECYCLE SERVICE |
Savings: $843 Cost: - |
- | - | - | - | - | - | $93 | 2,500 | - | - | $750 | - | - | - |
- - kWh |
- - kW-months/year |
- - Tgal |
$93 2,500 lb |
- - $ |
$750 - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $756 Cost: $142 |
$514 | 12,309 | $242 | 18 | - | - | - | - | - | - | - | - | - | - |
$514 12,309 kWh |
$242 18 kW-months/year |
- - Tgal |
- - lb |
- - $ |
- - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $229 Cost: $60 |
$144 | 3,517 | $85 | 6 | - | - | - | - | - | - | - | - | - | - |
$144 3,517 kWh |
$85 6 kW-months/year |
- - Tgal |
- - lb |
- - $ |
- - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $49,691 Cost: $62,402 |
$488 | 12,016 | $13,087 | 970 | $6,113 | 3,159,000 | $93 | 2,500 | $26,660 | - | $750 | - | $2,500 | - | $488 12,016 kWh |
$13,087 970 kW-months/year |
$6,113 3,159,000 Tgal |
$93 2,500 lb |
$26,660 - $ |
$750 - $ |
$2,500 - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $30,096 Cost: $44,260 |
$351 | 8,499 | $85 | 6 | - | - | - | - | $27,160 | - | - | - | $2,500 | - | $351 8,499 kWh |
$85 6 kW-months/year |
- - Tgal |
- - lb |
$27,160 - $ |
- - $ |
$2,500 - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | Tgal | $ | lb | $ | $ | $ | $ | $ | % | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Water Disposal | Solid Waste (non-haz) | Personnel Changes | Administrative Changes | Increase in Production | Electricity Usage | Electricity Demand | Water Disposal | Solid Waste (non-haz) | Personnel Changes | Administrative Changes | Increase in Production |