IAC logo
IAC Assessment: WI0348
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WI0348
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 1999
Principal Product Metal Rolled Products
NAICS n/a
SIC 3499 - Fabricated Metal Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 75
Plant Area (Sq.Ft.) 60,000
Annual Production 100,000,000 Pounds
Production Hrs. Annual 4,850
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $27,760 719,519 kWh $0.04
Electricity Demand $30,649 2,495 kW-months/year $12.28
Electricity Fees $7,549 - $ -
Natural Gas $23,081 5,826 MMBtu $3.96
TOTAL ENERGY COSTS $22,486
RECOMMENDED SAVINGS* $49,691 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $30,096
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Water Disposal Solid Waste (non-haz) Personnel Changes Administrative Changes Increase in Production Electricity Usage Electricity Demand Water Disposal Solid Waste (non-haz) Personnel Changes Administrative Changes Increase in Production
$ kWh $ kW-months/year $ Tgal $ lb $ $ $ $ $ %
01: 4.452 ELIMINATE SHIFT Savings:
$28,000
Cost:
$40,000
- - - - - - - - $28,000 - - - - - -
-
kWh
-
-
kW-months/year
-
-
Tgal
-
-
lb
$28,000
-
$
-
-
$
-
-
%
02: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$13,083
Cost:
-
- - $13,083 970 - - - - - - - - - - -
-
kWh
$13,083
970
kW-months/year
-
-
Tgal
-
-
lb
-
-
$
-
-
$
-
-
%
03: 3.4114 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER Savings:
$4,913
Cost:
$18,000
$(-377) (-8,792) $(-323) (-24) $6,113 3,159,000 - - $(-500) - - - - - $(-377)
(-8,792)
kWh
$(-323)
(-24)
kW-months/year
$6,113
3,159,000
Tgal
-
-
lb
$(-500)
-
$
-
-
$
-
-
%
04: 4.611 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE Savings:
$1,867
Cost:
$4,200
$207 4,982 - - - - - - $(-840) - - - $2,500 - $207
4,982
kWh
-
-
kW-months/year
-
-
Tgal
-
-
lb
$(-840)
-
$
-
-
$
$2,500
-
%
05: 3.7131 USE A RAG RECYCLE SERVICE Savings:
$843
Cost:
-
- - - - - - $93 2,500 - - $750 - - - -
-
kWh
-
-
kW-months/year
-
-
Tgal
$93
2,500
lb
-
-
$
$750
-
$
-
-
%
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$756
Cost:
$142
$514 12,309 $242 18 - - - - - - - - - - $514
12,309
kWh
$242
18
kW-months/year
-
-
Tgal
-
-
lb
-
-
$
-
-
$
-
-
%
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$229
Cost:
$60
$144 3,517 $85 6 - - - - - - - - - - $144
3,517
kWh
$85
6
kW-months/year
-
-
Tgal
-
-
lb
-
-
$
-
-
$
-
-
%
TOTAL RECOMMENDED Savings:
$49,691
Cost:
$62,402
$488 12,016 $13,087 970 $6,113 3,159,000 $93 2,500 $26,660 - $750 - $2,500 - $488
12,016
kWh
$13,087
970
kW-months/year
$6,113
3,159,000
Tgal
$93
2,500
lb
$26,660
-
$
$750
-
$
$2,500
-
%
TOTAL IMPLEMENTED Savings:
$30,096
Cost:
$44,260
$351 8,499 $85 6 - - - - $27,160 - - - $2,500 - $351
8,499
kWh
$85
6
kW-months/year
-
-
Tgal
-
-
lb
$27,160
-
$
-
-
$
$2,500
-
%
Savings
Cost
$ kWh $ kW-months/year $ Tgal $ lb $ $ $ $ $ %
Electricity Usage Electricity Demand Water Disposal Solid Waste (non-haz) Personnel Changes Administrative Changes Increase in Production Electricity Usage Electricity Demand Water Disposal Solid Waste (non-haz) Personnel Changes Administrative Changes Increase in Production