Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Wisconsin, Milwaukee |
---|---|
Assessment Year | 1999 |
Principal Product | Electric Heating Elements |
NAICS | n/a |
SIC | 3585 - Refrigeration And Heating Equipment |
Sales | $10,000,000-$50,000,000 |
# of Employees | 206 |
Plant Area (Sq.Ft.) | 392,300 |
Annual Production | 6,700,000 Pieces |
Production Hrs. Annual | 6,000 |
Location (State) | IL |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $389,782 | 10,581,477 | kWh | $0.04 |
Electricity Demand | $344,604 | 25,980 | kW-months/year | $13.26 |
Electricity Fees | $69,963 | - | $ | - |
Natural Gas | $230,740 | 78,181 | MMBtu | $2.95 |
TOTAL ENERGY COSTS | $1,130,126 | |||
RECOMMENDED SAVINGS* | $260,616 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $98,121 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Other Liquid (haz) | Solid Waste (non-haz) | Personnel Changes | Primary Raw Material | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Other Liquid (haz) | Solid Waste (non-haz) | Personnel Changes | Primary Raw Material | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | gal | $ | lb | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 3.4114 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER |
Savings: $97,790 Cost: $44,000 |
$(-1,011) | (-24,912) | $(-832) | (-57) | - | - | $99,633 | 26,082,000 | - | - | - | - | - | - | - | - |
$(-1,011) (-24,912) kWh |
$(-832) (-57) kW-months/year |
- - MMBtu |
$99,633 26,082,000 Tgal |
- - gal |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.3134 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION |
Savings: $92,705 Cost: - |
- | - | $98,705 | 5,058 | - | - | - | - | - | - | - | - | $(-6,000) | - | - | - |
- - kWh |
$98,705 5,058 kW-months/year |
- - MMBtu |
- - Tgal |
- - gal |
- - lb |
$(-6,000) - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.3415 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT |
Savings: $54,425 Cost: $102,000 |
$60,900 | 1,500,000 | $43,860 | 3,000 | $(-50,335) | (-17,063) | - | - | - | - | - | - | - | - | - | - |
$60,900 1,500,000 kWh |
$43,860 3,000 kW-months/year |
$(-50,335) (-17,063) MMBtu |
- - Tgal |
- - gal |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 3.8142 DISTILL CONTAMINATED SOLVENTS FOR REUSE |
Savings: $7,803 Cost: $13,900 |
- | - | - | - | - | - | - | - | $13,200 | 1,500 | $(-506) | (-670) | $(-3,591) | - | $(-1,300) | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
$13,200 1,500 gal |
$(-506) (-670) lb |
$(-3,591) - $ |
$(-1,300) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $6,466 Cost: $200 |
$3,293 | 81,184 | $3,173 | 217 | - | - | - | - | - | - | - | - | - | - | - | - |
$3,293 81,184 kWh |
$3,173 217 kW-months/year |
- - MMBtu |
- - Tgal |
- - gal |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $1,096 Cost: $3,850 |
$485 | 12,016 | $262 | 18 | $349 | 118 | - | - | - | - | - | - | - | - | - | - |
$485 12,016 kWh |
$262 18 kW-months/year |
$349 118 MMBtu |
- - Tgal |
- - gal |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $331 Cost: $107 |
$231 | 5,569 | $100 | 7 | - | - | - | - | - | - | - | - | - | - | - | - |
$231 5,569 kWh |
$100 7 kW-months/year |
- - MMBtu |
- - Tgal |
- - gal |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $260,616 Cost: $164,057 |
$63,898 | 1,573,857 | $145,268 | 8,243 | $(-49,986) | (-16,945) | $99,633 | 26,082,000 | $13,200 | 1,500 | $(-506) | (-670) | $(-9,591) | - | $(-1,300) | - | $63,898 1,573,857 kWh |
$145,268 8,243 kW-months/year |
$(-49,986) (-16,945) MMBtu |
$99,633 26,082,000 Tgal |
$13,200 1,500 gal |
$(-506) (-670) lb |
$(-9,591) - $ |
$(-1,300) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $98,121 Cost: $44,107 |
$(-780) | (-19,343) | $(-732) | (-50) | - | - | $99,633 | 26,082,000 | - | - | - | - | - | - | - | - | $(-780) (-19,343) kWh |
$(-732) (-50) kW-months/year |
- - MMBtu |
$99,633 26,082,000 Tgal |
- - gal |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | gal | $ | lb | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Other Liquid (haz) | Solid Waste (non-haz) | Personnel Changes | Primary Raw Material | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Other Liquid (haz) | Solid Waste (non-haz) | Personnel Changes | Primary Raw Material |