Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 2000
Principal Product Springs and Stampings
NAICS n/a
SIC 3493 - Steel Springs, Except Wire
Sales $10,000,000-$50,000,000
# of Employees 251
Plant Area (Sq.Ft.) 78,000
Annual Production 900,000,000 Pieces
Production Hrs. Annual 7,200
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $117,195 2,827,667 kWh $0.04
Electricity Demand $86,576 7,126 kW-months/year $12.15
Electricity Fees $10,797 - $ -
Natural Gas $34,429 8,873 MMBtu $3.88
TOTAL ENERGY COSTS $272,398
RECOMMENDED SAVINGS* $76,516 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $3,418
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Solid Waste (non-haz) Personnel Changes Administrative Changes Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Solid Waste (non-haz) Personnel Changes Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ gal $ lb $ $ $ $
01: 4.126 INSTALL SENSORS TO DETECT DEFECTS Savings:
$36,000
Cost:
$35,000
- - - - - - - - - - $36,000 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
$36,000
-
$
-
-
$
02: 3.8142 DISTILL CONTAMINATED SOLVENTS FOR REUSE Savings:
$20,843
Cost:
$14,000
- - - - - - $24,036 3,053 $(-1,036) (-1,412) $(-2,157) - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$24,036
3,053
gal
$(-1,036)
(-1,412)
lb
$(-2,157)
-
$
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$8,891
Cost:
$11,765
$6,508 150,059 $2,383 187 - - - - - - - - - - $6,508
150,059
kWh
$2,383
187
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$3,151
Cost:
$740
$2,306 53,048 $845 66 - - - - - - - - - - $2,306
53,048
kWh
$845
66
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$473
Cost:
$90
$346 7,913 $127 10 - - - - - - - - - - $346
7,913
kWh
$127
10
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
06: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$2,945
Cost:
$8,000
- - - - - - - - $3,245 - $(-300) - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
$3,245
-
lb
$(-300)
-
$
-
-
$
07: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL Savings:
$2,040
Cost:
-
- - - - - - - - - - - - $2,040 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
$2,040
-
$
08: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$573
Cost:
$200
- - - - $573 148 - - - - - - - - -
-
kWh
-
-
kW-months/year
$573
148
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
09: 2.3132 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS Savings:
$527
Cost:
$100
- - $527 41 - - - - - - - - - - -
-
kWh
$527
41
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
10: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$429
Cost:
-
$211 4,982 $218 17 - - - - - - - - - - $211
4,982
kWh
$218
17
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
11: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$296
Cost:
$285
$146 3,224 $150 12 - - - - - - - - - - $146
3,224
kWh
$150
12
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
12: 2.2511 INSULATE BARE EQUIPMENT Savings:
$348
Cost:
$238
$224 5,275 $124 10 - - - - - - - - - - $224
5,275
kWh
$124
10
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$76,516
Cost:
$70,418
$9,741 224,501 $4,374 343 $573 148 $24,036 3,053 $2,209 (-1,412) $33,543 - $2,040 - $9,741
224,501
kWh
$4,374
343
kW-months/year
$573
148
MMBtu
$24,036
3,053
gal
$2,209
(-1,412)
lb
$33,543
-
$
$2,040
-
$
TOTAL IMPLEMENTED Savings:
$3,418
Cost:
$8,090
$346 7,913 $127 10 - - - - $3,245 - $(-300) - - - $346
7,913
kWh
$127
10
kW-months/year
-
-
MMBtu
-
-
gal
$3,245
-
lb
$(-300)
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ gal $ lb $ $ $ $
Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Solid Waste (non-haz) Personnel Changes Administrative Changes Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Solid Waste (non-haz) Personnel Changes Administrative Changes