IAC logo
IAC Assessment: WI0408
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WI0408
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 2001
Principal Product Steel Casting
NAICS n/a
SIC 3325 - Steel Foundries, Nec
Sales $10,000,000-$50,000,000
# of Employees 457
Plant Area (Sq.Ft.) 201,000
Annual Production 13,000 Tons
Production Hrs. Annual 7,200
Location (State) WI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $875,896 33,517,717 kWh $0.03
Electricity Demand $865,155 96,504 kW-months/year $8.96
Electricity Fees $113,234 - $ -
Natural Gas $1,031,979 172,106 MMBtu $6.00
TOTAL ENERGY COSTS $3,168,800
RECOMMENDED SAVINGS* $137,625 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Water Disposal One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $
01: 4.426 MODIFY WORKLOAD Savings:
$33,405
Cost:
$30,000
- - - - - - - - $33,405 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
$33,405
-
$
02: 3.4151 MINIMIZE WATER USAGE Savings:
$29,411
Cost:
$2,200
- - - - - - $29,411 1,789,200 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$29,411
1,789,200
Tgal
-
-
$
03: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$23,329
Cost:
$31,000
$(-50) (-1,811) - - $23,379 3,905 - - - - $(-50)
(-1,811)
kWh
-
-
kW-months/year
$23,379
3,905
MMBtu
-
-
Tgal
-
-
$
04: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$20,025
Cost:
-
- - $20,025 2,250 - - - - - - -
-
kWh
$20,025
2,250
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$14,442
Cost:
$6,917
$10,254 371,508 $4,188 418 - - - - - - $10,254
371,508
kWh
$4,188
418
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
06: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$11,596
Cost:
$12,000
- - - - $11,596 1,932 - - - - -
-
kWh
-
-
kW-months/year
$11,596
1,932
MMBtu
-
-
Tgal
-
-
$
07: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$3,941
Cost:
$11,250
- - - - $3,941 660 - - - - -
-
kWh
-
-
kW-months/year
$3,941
660
MMBtu
-
-
Tgal
-
-
$
08: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,476
Cost:
$6,957
$923 33,426 $553 55 - - - - - - $923
33,426
kWh
$553
55
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
TOTAL RECOMMENDED Savings:
$137,625
Cost:
$100,324
$11,127 403,123 $24,766 2,723 $38,916 6,497 $29,411 1,789,200 $33,405 - $11,127
403,123
kWh
$24,766
2,723
kW-months/year
$38,916
6,497
MMBtu
$29,411
1,789,200
Tgal
$33,405
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $
Electricity Usage Electricity Demand Natural Gas Water Disposal One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Water Disposal One-time Revenue or Avoided Cost