IAC logo
IAC Assessment: WI0410
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WI0410
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 2002
Principal Product Custom furniture
NAICS n/a
SIC 2517 - Wood Tv And Radio Cabinets
Sales $10,000,000-$50,000,000
# of Employees 120
Plant Area (Sq.Ft.) 100,000
Annual Production 13,000 Pieces
Production Hrs. Annual 4,275
Location (State) WI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $183,505 2,446,109 kWh $0.08
Electricity Demand $79,883 8,069 kW-months/year $9.90
Electricity Fees $17,982 - $ -
Natural Gas $91,237 10,824 MMBtu $8.43
TOTAL ENERGY COSTS $376,926
RECOMMENDED SAVINGS* $33,749 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $17,530
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$8,178
Cost:
$4,800
$(-241) (-6,584) - - $8,419 1,007 $(-241)
(-6,584)
kWh
-
-
kW-months/year
$8,419
1,007
MMBtu
02: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$5,395
Cost:
$600
- - - - $5,395 640 -
-
kWh
-
-
kW-months/year
$5,395
640
MMBtu
03: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$5,443
Cost:
-
- - $5,443 649 - - -
-
kWh
$5,443
649
kW-months/year
-
-
MMBtu
04: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$4,636
Cost:
$1,050
$(-16) (-446) - - $4,652 554 $(-16)
(-446)
kWh
-
-
kW-months/year
$4,652
554
MMBtu
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$3,885
Cost:
$20,800
$3,885 106,135 - - - - $3,885
106,135
kWh
-
-
kW-months/year
-
-
MMBtu
06: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$3,015
Cost:
$1,657
$1,876 51,278 $1,139 109 - - $1,876
51,278
kWh
$1,139
109
kW-months/year
-
-
MMBtu
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,255
Cost:
$7,140
$1,408 34,489 $847 81 - - $1,408
34,489
kWh
$847
81
kW-months/year
-
-
MMBtu
08: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$942
Cost:
$740
$589 16,095 $353 34 - - $589
16,095
kWh
$353
34
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$33,749
Cost:
$36,787
$7,501 200,967 $7,782 873 $18,466 2,201 $7,501
200,967
kWh
$7,782
873
kW-months/year
$18,466
2,201
MMBtu
TOTAL IMPLEMENTED Savings:
$17,530
Cost:
$7,797
$2,224 60,789 $1,492 143 $13,814 1,647 $2,224
60,789
kWh
$1,492
143
kW-months/year
$13,814
1,647
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas