Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Wisconsin, Milwaukee |
---|---|
Assessment Year | 2002 |
Principal Product | Die Castings |
NAICS | n/a |
SIC | 3363 - Aluminum Die-castings |
Sales | $1,000,000-$5,000,000 |
# of Employees | 187 |
Plant Area (Sq.Ft.) | 120,000 |
Annual Production | 120,000 Pounds |
Production Hrs. Annual | 6,900 |
Location (State) | WI |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $161,603 | 6,142,397 | kWh | $0.03 |
Electricity Demand | $125,234 | 14,412 | kW-months/year | $8.69 |
Electricity Fees | $37,519 | - | $ | - |
Natural Gas | $322,246 | 57,525 | MMBtu | $5.60 |
TOTAL ENERGY COSTS | $663,402 | |||
RECOMMENDED SAVINGS* | $40,940 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $20,289 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (non-haz) | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (non-haz) | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | gal | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 3.5311 RECOVER AND REUSE WASTE MATERIAL |
Savings: $16,280 Cost: $8,000 |
- | - | - | - | - | - | $16,280 | 1,440 | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$16,280 1,440 gal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 3.3131 USE EVAPORATION TO CONCENTRATE MATERIAL |
Savings: $6,896 Cost: $11,000 |
- | - | - | - | $(-2,499) | (-446) | $10,725 | 35,700 | $(-1,330) | - |
- - kWh |
- - kW-months/year |
$(-2,499) (-446) MMBtu |
$10,725 35,700 gal |
$(-1,330) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS |
Savings: $5,700 Cost: - |
- | - | $5,700 | 995 | - | - | - | - | - | - |
- - kWh |
$5,700 995 kW-months/year |
- - MMBtu |
- - gal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $5,213 Cost: $11,042 |
$3,336 | 120,002 | $1,877 | 201 | - | - | - | - | - | - |
$3,336 120,002 kWh |
$1,877 201 kW-months/year |
- - MMBtu |
- - gal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $3,052 Cost: $150 |
$2,122 | 76,302 | $930 | 100 | - | - | - | - | - | - |
$2,122 76,302 kWh |
$930 100 kW-months/year |
- - MMBtu |
- - gal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7314 REDUCE VENTILATION AIR |
Savings: $2,842 Cost: $8,000 |
$1,586 | 57,048 | $1,256 | 134 | - | - | - | - | - | - |
$1,586 57,048 kWh |
$1,256 134 kW-months/year |
- - MMBtu |
- - gal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $957 Cost: $356 |
$604 | 21,735 | $353 | 38 | - | - | - | - | - | - |
$604 21,735 kWh |
$353 38 kW-months/year |
- - MMBtu |
- - gal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $40,940 Cost: $38,548 |
$7,648 | 275,087 | $10,116 | 1,468 | $(-2,499) | (-446) | $27,005 | 37,140 | $(-1,330) | - | $7,648 275,087 kWh |
$10,116 1,468 kW-months/year |
$(-2,499) (-446) MMBtu |
$27,005 37,140 gal |
$(-1,330) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $20,289 Cost: $8,506 |
$2,726 | 98,037 | $1,283 | 138 | - | - | $16,280 | 1,440 | - | - | $2,726 98,037 kWh |
$1,283 138 kW-months/year |
- - MMBtu |
$16,280 1,440 gal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | gal | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (non-haz) | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (non-haz) | Personnel Changes |