Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Wisconsin, Milwaukee |
---|---|
Assessment Year | 2006 |
Principal Product | die cast parts |
NAICS | 332119 - Metal Crown, Closure, and Other Metal Stamping (except Automotive) |
SIC | 3469 - Metal Stampings, Nec |
Sales | $50,000,000-$100,000,000 |
# of Employees | 200 |
Plant Area (Sq.Ft.) | 200,000 |
Annual Production | 0 Units |
Production Hrs. Annual | 6,000 |
Location (State) | WI |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $273,943 | 7,868,400 | kWh | $0.03 |
Electricity Demand | $148,848 | 16,789 | kW-months/year | $8.87 |
Natural Gas | $914,302 | 115,096 | MMBtu | $7.94 |
TOTAL ENERGY COSTS | $1,337,093 | |||
RECOMMENDED SAVINGS* | $64,746 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $36,130 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Other Liquid (non-haz) | Administrative Changes | Electricity Usage | Electricity Demand | Other Liquid (non-haz) | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | gal | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 4.513 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS |
Savings: $554 Cost: $21,500 |
- | - | - | - | - | - | $554 | - |
- - kWh |
- - kW-months/year |
- - gal |
$554 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $29,679 Cost: $72,610 |
$19,672 | 534,570 | $10,007 | 902 | - | - | - | - |
$19,672 534,570 kWh |
$10,007 902 kW-months/year |
- - gal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 3.3131 USE EVAPORATION TO CONCENTRATE MATERIAL |
Savings: $24,691 Cost: $12,000 |
- | - | - | - | $24,691 | 12,128 | - | - |
- - kWh |
- - kW-months/year |
$24,691 12,128 gal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 4.447 AUTOMATE PAYROLL SYSTEM |
Savings: $5,350 Cost: - |
- | - | - | - | - | - | $5,350 | - |
- - kWh |
- - kW-months/year |
- - gal |
$5,350 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $3,371 Cost: $3,200 |
$1,728 | 46,956 | $1,643 | 176 | - | - | - | - |
$1,728 46,956 kWh |
$1,643 176 kW-months/year |
- - gal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.3132 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS |
Savings: $843 Cost: $700 |
- | - | $843 | 9 | - | - | - | - |
- - kWh |
$843 9 kW-months/year |
- - gal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $258 Cost: $150 |
$258 | 7,020 | - | - | - | - | - | - |
$258 7,020 kWh |
- - kW-months/year |
- - gal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $64,746 Cost: $110,160 |
$21,658 | 588,546 | $12,493 | 1,087 | $24,691 | 12,128 | $5,904 | - | $21,658 588,546 kWh |
$12,493 1,087 kW-months/year |
$24,691 12,128 gal |
$5,904 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $36,130 Cost: $73,460 |
$19,930 | 541,590 | $10,850 | 911 | - | - | $5,350 | - | $19,930 541,590 kWh |
$10,850 911 kW-months/year |
- - gal |
$5,350 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | gal | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Other Liquid (non-haz) | Administrative Changes | Electricity Usage | Electricity Demand | Other Liquid (non-haz) | Administrative Changes |