IAC Assessment: WV0085
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WV0085
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center West Virginia University
Assessment Year 1996
Principal Product Boiler tubular panels
NAICS n/a
SIC 3443 - Fabricated Plate Work (boiler Shops)
Sales $10,000,000-$50,000,000
# of Employees 45
Plant Area (Sq.Ft.) 180,000
Annual Production 2,500 Tons
Production Hrs. Annual 4,160
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $35,378 925,264 kWh $0.04
Electricity Demand $64,168 3,495 kW-months/year $18.36
TOTAL ENERGY COSTS $99,546
RECOMMENDED SAVINGS* $20,865 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $11,685
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Water Disposal Electricity Usage Electricity Demand Water Disposal
$ kWh $ kW-months/year $ Tgal
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$962
Cost:
$6,073
$962 22,274 - - - - $962
22,274
kWh
-
-
kW-months/year
-
-
Tgal
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$779
Cost:
$3,050
$779 18,171 - - - - $779
18,171
kWh
-
-
kW-months/year
-
-
Tgal
03: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$250
Cost:
$400
$250 5,569 - - - - $250
5,569
kWh
-
-
kW-months/year
-
-
Tgal
04: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$9,694
Cost:
$500
- - $9,694 528 - - -
-
kWh
$9,694
528
kW-months/year
-
-
Tgal
05: 3.4111 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION Savings:
$9,180
Cost:
$9,200
$(-420) (-9,672) - - $9,600 1,200,000 $(-420)
(-9,672)
kWh
-
-
kW-months/year
$9,600
1,200,000
Tgal
TOTAL RECOMMENDED Savings:
$20,865
Cost:
$19,223
$1,571 36,342 $9,694 528 $9,600 1,200,000 $1,571
36,342
kWh
$9,694
528
kW-months/year
$9,600
1,200,000
Tgal
TOTAL IMPLEMENTED Savings:
$11,685
Cost:
$10,023
$1,991 46,014 $9,694 528 - - $1,991
46,014
kWh
$9,694
528
kW-months/year
-
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ Tgal
Electricity Usage Electricity Demand Water Disposal Electricity Usage Electricity Demand Water Disposal