IAC logo
IAC Assessment: WV0125
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WV0125
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center West Virginia University
Assessment Year 1997
Principal Product Boilers and HVAC Equipment
NAICS n/a
SIC 3433 - Heating Equipment, Except Electric
Sales $10,000,000-$50,000,000
# of Employees 188
Plant Area (Sq.Ft.) 190,000
Annual Production 15,000 Tons
Production Hrs. Annual 4,862
Location (State) PA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $103,547 3,039,566 kWh $0.03
Electricity Demand $83,724 8,782 kW-months/year $9.53
Electricity Fees $28,213 - $ -
Natural Gas $120,537 45,955 MMBtu $2.62
TOTAL ENERGY COSTS $339,499
RECOMMENDED SAVINGS* $278,083 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $50,912
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Administrative Changes Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$11,488
Cost:
$1,329
$5,204 60,082 $6,284 658 - - - - - - - - $5,204
60,082
kWh
$6,284
658
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$2,011
Cost:
$2,499
$541 12,603 $1,470 154 - - - - - - - - $541
12,603
kWh
$1,470
154
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$191
Cost:
$240
$191 4,396 - - - - - - - - - - $191
4,396
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$165
Cost:
$168
$165 3,810 - - - - - - - - - - $165
3,810
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
05: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$699
Cost:
$351
$699 16,120 - - - - - - - - - - $699
16,120
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
06: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$22,920
Cost:
-
- - $22,920 2,400 - - - - - - - - -
-
kWh
$22,920
2,400
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
07: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$1,915
Cost:
$1,809
- - - - $1,915 731 - - - - - - -
-
kWh
-
-
kW-months/year
$1,915
731
MMBtu
-
-
Tgal
-
-
$
-
-
$
08: 2.8123 PAY UTILITY BILLS ON TIME Savings:
$2,478
Cost:
-
- - - - - - - - - - $2,478 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
$2,478
-
$
09: 3.5248 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE Savings:
$28,350
Cost:
-
- - - - - - - - - - $28,350 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
$28,350
-
$
10: 3.4111 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION Savings:
$86
Cost:
$160
- - - - - - $86 59,670 - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$86
59,670
Tgal
-
-
$
-
-
$
11: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$3,780
Cost:
-
- - - - - - - - - - $3,780 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
$3,780
-
$
12: 4.423 MOVE PRODUCT USING MECHANICAL MEANS Savings:
$204,000
Cost:
$302,500
- - - - - - - - $204,000 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
$204,000
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$278,083
Cost:
$309,056
$6,800 97,011 $30,674 3,212 $1,915 731 $86 59,670 $204,000 - $34,608 - $6,800
97,011
kWh
$30,674
3,212
kW-months/year
$1,915
731
MMBtu
$86
59,670
Tgal
$204,000
-
$
$34,608
-
$
TOTAL IMPLEMENTED Savings:
$50,912
Cost:
$6,228
$6,635 93,201 $7,754 812 $1,915 731 - - - - $34,608 - $6,635
93,201
kWh
$7,754
812
kW-months/year
$1,915
731
MMBtu
-
-
Tgal
-
-
$
$34,608
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $ $ $
Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Administrative Changes Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Administrative Changes