Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | West Virginia University |
---|---|
Assessment Year | 1998 |
Principal Product | Stamped lead Plates |
NAICS | n/a |
SIC | 3469 - Metal Stampings, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 200 |
Plant Area (Sq.Ft.) | 50,000 |
Annual Production | 600,000 Pounds |
Production Hrs. Annual | 7,200 |
Location (State) | PA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $237,321 | 4,883,060 | kWh | $0.05 |
Natural Gas | $12,822 | 1,326 | MMBtu | $9.67 |
TOTAL ENERGY COSTS | $250,143 | |||
RECOMMENDED SAVINGS* | $75,195 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $32,254 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Other Gas | Other Liquid (non-haz) | Solid Waste (non-haz) | Administrative Changes | Electricity Usage | Natural Gas | Other Gas | Other Liquid (non-haz) | Solid Waste (non-haz) | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | MMBtu | $ | gal | $ | lb | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $3,346 Cost: $1,000 |
- | - | $3,346 | 346 | - | - | - | - | - | - | - | - |
- - kWh |
$3,346 346 MMBtu |
- - MMBtu |
- - gal |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $6,131 Cost: $10,800 |
$6,131 | 126,319 | - | - | - | - | - | - | - | - | - | - |
$6,131 126,319 kWh |
- - MMBtu |
- - MMBtu |
- - gal |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.1331 BURN A LESS EXPENSIVE GRADE OF FUEL |
Savings: $2,650 Cost: $2,400 |
- | - | - | - | $2,650 | - | - | - | - | - | - | - |
- - kWh |
- - MMBtu |
$2,650 - MMBtu |
- - gal |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4314 USE SYNTHETIC LUBRICANT |
Savings: $498 Cost: $342 |
$498 | 10,258 | - | - | - | - | - | - | - | - | - | - |
$498 10,258 kWh |
- - MMBtu |
- - MMBtu |
- - gal |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.1213 DIRECT WARMEST AIR TO COMBUSTION INTAKE |
Savings: $1,671 Cost: $1,420 |
- | - | $1,671 | 173 | - | - | - | - | - | - | - | - |
- - kWh |
$1,671 173 MMBtu |
- - MMBtu |
- - gal |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $10,274 Cost: $470 |
- | - | $10,274 | 1,062 | - | - | - | - | - | - | - | - |
- - kWh |
$10,274 1,062 MMBtu |
- - MMBtu |
- - gal |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $1,125 Cost: $383 |
$1,125 | 23,154 | - | - | - | - | - | - | - | - | - | - |
$1,125 23,154 kWh |
- - MMBtu |
- - MMBtu |
- - gal |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 3.5142 TREAT AND REUSE EQUIPMENT CLEANING SOLUTIONS |
Savings: $25,000 Cost: $4,530 |
- | - | - | - | - | - | $25,000 | - | - | - | - | - |
- - kWh |
- - MMBtu |
- - MMBtu |
$25,000 - gal |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 3.5311 RECOVER AND REUSE WASTE MATERIAL |
Savings: $360 Cost: - |
- | - | - | - | - | - | - | - | $360 | - | - | - |
- - kWh |
- - MMBtu |
- - MMBtu |
- - gal |
$360 - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY |
Savings: $3,840 Cost: $42 |
- | - | - | - | - | - | - | - | $3,840 | - | - | - |
- - kWh |
- - MMBtu |
- - MMBtu |
- - gal |
$3,840 - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 4.521 CLEAR AND RENT EXISTING SPACE |
Savings: $20,300 Cost: $336 |
- | - | - | - | - | - | - | - | - | - | $20,300 | - |
- - kWh |
- - MMBtu |
- - MMBtu |
- - gal |
- - lb |
$20,300 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $75,195 Cost: $21,723 |
$7,754 | 159,731 | $15,291 | 1,581 | $2,650 | - | $25,000 | - | $4,200 | - | $20,300 | - | $7,754 159,731 kWh |
$15,291 1,581 MMBtu |
$2,650 - MMBtu |
$25,000 - gal |
$4,200 - lb |
$20,300 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $32,254 Cost: $11,903 |
$7,754 | 159,731 | - | - | - | - | - | - | $4,200 | - | $20,300 | - | $7,754 159,731 kWh |
- - MMBtu |
- - MMBtu |
- - gal |
$4,200 - lb |
$20,300 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | MMBtu | $ | gal | $ | lb | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Other Gas | Other Liquid (non-haz) | Solid Waste (non-haz) | Administrative Changes | Electricity Usage | Natural Gas | Other Gas | Other Liquid (non-haz) | Solid Waste (non-haz) | Administrative Changes |