IAC logo
IAC Assessment: WV0149
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WV0149
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center West Virginia University
Assessment Year 1998
Principal Product Automotive Gaskets
NAICS n/a
SIC 3069 - Fabricated Rubber Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 60
Plant Area (Sq.Ft.) 100,000
Annual Production 10,000,000 Pounds
Production Hrs. Annual 6,000
Location (State) WV
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $134,022 5,028,722 kWh $0.03
Electricity Demand $119,461 12,768 kW-months/year $9.36
Electricity Fees $18,075 - $ -
Natural Gas $215,323 46,066 MMBtu $4.67
TOTAL ENERGY COSTS $486,881
RECOMMENDED SAVINGS* $162,417 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $87,523
#|Description Savings
Cost
Status Electricity Usage Electricity Fees Natural Gas Other Gas Water Disposal Solid Waste (non-haz) Personnel Changes Administrative Changes Electricity Usage Electricity Fees Natural Gas Other Gas Water Disposal Solid Waste (non-haz) Personnel Changes Administrative Changes
$ kWh $ $ $ MMBtu $ MMBtu $ Tgal $ lb $ $ $ $
01: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$886
Cost:
$98
$886 29,308 - - - - - - - - - - - - - - $886
29,308
kWh
-
-
$
-
-
MMBtu
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
02: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$5,271
Cost:
-
$5,271 174,385 - - - - - - - - - - - - - - $5,271
174,385
kWh
-
-
$
-
-
MMBtu
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
03: 2.6213 TURN OFF STEAM / HOT WATER LINES LEADING TO SPACE HEATING UNITS Savings:
$16,316
Cost:
-
- - - - $16,316 3,494 - - - - - - - - - - -
-
kWh
-
-
$
$16,316
3,494
MMBtu
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
04: 2.8113 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER Savings:
$53,897
Cost:
-
- - - - $53,897 - - - - - - - - - - - -
-
kWh
-
-
$
$53,897
-
MMBtu
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
05: 2.1331 BURN A LESS EXPENSIVE GRADE OF FUEL Savings:
$4,200
Cost:
$7,200
- - - - - - $300 - - - - - $3,900 - - - -
-
kWh
-
-
$
-
-
MMBtu
$300
-
MMBtu
-
-
Tgal
-
-
lb
$3,900
-
$
-
-
$
06: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$6,988
Cost:
$3,005
- - - - $6,988 1,496 - - - - - - - - - - -
-
kWh
-
-
$
$6,988
1,496
MMBtu
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
07: 2.8123 PAY UTILITY BILLS ON TIME Savings:
$1,820
Cost:
-
- - - - - - - - - - - - - - $1,820 - -
-
kWh
-
-
$
-
-
MMBtu
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
$1,820
-
$
08: 2.2511 INSULATE BARE EQUIPMENT Savings:
$1,667
Cost:
$1,120
- - - - $1,667 357 - - - - - - - - - - -
-
kWh
-
-
$
$1,667
357
MMBtu
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
09: 2.2511 INSULATE BARE EQUIPMENT Savings:
$411
Cost:
$320
- - - - $411 88 - - - - - - - - - - -
-
kWh
-
-
$
$411
88
MMBtu
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
10: 2.2514 COVER OPEN TANKS Savings:
$1,515
Cost:
$4,656
- - - - $1,515 174 - - - - - - - - - - -
-
kWh
-
-
$
$1,515
174
MMBtu
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
11: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$4,342
Cost:
$14,610
- - $4,342 - - - - - - - - - - - - - -
-
kWh
$4,342
-
$
-
-
MMBtu
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
12: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$118
Cost:
$5,030
$118 38,980 - - - - - - - - - - - - - - $118
38,980
kWh
-
-
$
-
-
MMBtu
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
13: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$2,715
Cost:
$3,272
- - - - $2,715 581 - - - - - - - - - - -
-
kWh
-
-
$
$2,715
581
MMBtu
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
14: 2.1113 REDUCE COMBUSTION AIR FLOW TO OPTIMUM Savings:
$2,046
Cost:
$1,000
- - - - $2,046 438 - - - - - - - - - - -
-
kWh
-
-
$
$2,046
438
MMBtu
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
15: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,365
Cost:
$960
$1,365 45,135 - - - - - - - - - - - - - - $1,365
45,135
kWh
-
-
$
-
-
MMBtu
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
16: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$3,840
Cost:
$42
- - - - - - - - - - $3,840 - - - - - -
-
kWh
-
-
$
-
-
MMBtu
-
-
MMBtu
-
-
Tgal
$3,840
-
lb
-
-
$
-
-
$
17: 3.3131 USE EVAPORATION TO CONCENTRATE MATERIAL Savings:
$1,020
Cost:
$1,068
- - - - - - - - $1,020 - - - - - - - -
-
kWh
-
-
$
-
-
MMBtu
-
-
MMBtu
$1,020
-
Tgal
-
-
lb
-
-
$
-
-
$
18: 4.431 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY Savings:
$54,000
Cost:
-
- - - - - - - - - - - - $54,000 - - - -
-
kWh
-
-
$
-
-
MMBtu
-
-
MMBtu
-
-
Tgal
-
-
lb
$54,000
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$162,417
Cost:
$42,381
$7,640 287,808 $4,342 - $85,555 6,628 $300 - $1,020 - $3,840 - $57,900 - $1,820 - $7,640
287,808
kWh
$4,342
-
$
$85,555
6,628
MMBtu
$300
-
MMBtu
$1,020
-
Tgal
$3,840
-
lb
$57,900
-
$
$1,820
-
$
TOTAL IMPLEMENTED Savings:
$87,523
Cost:
$10,744
$6,754 258,500 - - $21,109 4,520 - - - - $3,840 - $54,000 - $1,820 - $6,754
258,500
kWh
-
-
$
$21,109
4,520
MMBtu
-
-
MMBtu
-
-
Tgal
$3,840
-
lb
$54,000
-
$
$1,820
-
$
Savings
Cost
$ kWh $ $ $ MMBtu $ MMBtu $ Tgal $ lb $ $ $ $
Electricity Usage Electricity Fees Natural Gas Other Gas Water Disposal Solid Waste (non-haz) Personnel Changes Administrative Changes Electricity Usage Electricity Fees Natural Gas Other Gas Water Disposal Solid Waste (non-haz) Personnel Changes Administrative Changes