Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | West Virginia University |
---|---|
Assessment Year | 2002 |
Principal Product | Plastic Buckets |
NAICS | n/a |
SIC | 3089 - Plastics Products, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 60 |
Plant Area (Sq.Ft.) | 53,058 |
Annual Production | 10,000,000 Pieces |
Production Hrs. Annual | 8,568 |
Location (State) | OH |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $280,450 | 7,126,800 | kWh | $0.04 |
Electricity Demand | $198,290 | 13,629 | kW-months/year | $14.55 |
Natural Gas | $24,450 | 2,943 | MMBtu | $8.31 |
TOTAL ENERGY COSTS | $503,190 | |||
RECOMMENDED SAVINGS* | $67,476 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $52,371 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Solid Waste (haz) | Personnel Changes | Administrative Changes | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Solid Waste (haz) | Personnel Changes | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | lb | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $1,103 Cost: $140 |
$697 | 19,390 | $406 | 2 | - | - | - | - | - | - | - | - | - | - |
$697 19,390 kWh |
$406 2 kW-months/year |
- - MMBtu |
- - Tgal |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $934 Cost: $34 |
$591 | 16,408 | $343 | 2 | - | - | - | - | - | - | - | - | - | - |
$591 16,408 kWh |
$343 2 kW-months/year |
- - MMBtu |
- - Tgal |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2515 USE OPTIMUM THICKNESS INSULATION |
Savings: $5,194 Cost: $840 |
- | - | - | - | $5,194 | 625 | - | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$5,194 625 MMBtu |
- - Tgal |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $10,209 Cost: $316 |
$6,452 | 179,023 | $3,757 | 21 | - | - | - | - | - | - | - | - | - | - |
$6,452 179,023 kWh |
$3,757 21 kW-months/year |
- - MMBtu |
- - Tgal |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.6221 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY |
Savings: $14,097 Cost: $340 |
$9,166 | 254,324 | $5,339 | 30 | - | - | - | - | - | - | $(-408) | - | - | - |
$9,166 254,324 kWh |
$5,339 30 kW-months/year |
- - MMBtu |
- - Tgal |
- - lb |
$(-408) - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $1,454 Cost: $600 |
$919 | 25,498 | $535 | 3 | - | - | - | - | - | - | - | - | - | - |
$919 25,498 kWh |
$535 3 kW-months/year |
- - MMBtu |
- - Tgal |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS |
Savings: $7,421 Cost: $850 |
$4,689 | 130,063 | $2,732 | 15 | - | - | - | - | - | - | - | - | - | - |
$4,689 130,063 kWh |
$2,732 15 kW-months/year |
- - MMBtu |
- - Tgal |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $534 Cost: $1,660 |
$167 | 4,696 | $367 | 2 | - | - | - | - | - | - | - | - | - | - |
$167 4,696 kWh |
$367 2 kW-months/year |
- - MMBtu |
- - Tgal |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.2614 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING |
Savings: $14,002 Cost: - |
$10,856 | 301,286 | $3,146 | 35 | - | - | - | - | - | - | - | - | - | - |
$10,856 301,286 kWh |
$3,146 35 kW-months/year |
- - MMBtu |
- - Tgal |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 3.4116 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) |
Savings: $8,295 Cost: - |
- | - | - | - | - | - | $8,295 | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$8,295 - Tgal |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS |
Savings: $233 Cost: $34 |
- | - | - | - | - | - | - | - | $233 | - | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
$233 - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12: 4.521 CLEAR AND RENT EXISTING SPACE |
Savings: $4,000 Cost: $670 |
- | - | - | - | - | - | - | - | - | - | - | - | $4,000 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - lb |
- - $ |
$4,000 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $67,476 Cost: $5,484 |
$33,537 | 930,688 | $16,625 | 110 | $5,194 | 625 | $8,295 | - | $233 | - | $(-408) | - | $4,000 | - | $33,537 930,688 kWh |
$16,625 110 kW-months/year |
$5,194 625 MMBtu |
$8,295 - Tgal |
$233 - lb |
$(-408) - $ |
$4,000 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $52,371 Cost: $5,344 |
$21,984 | 610,012 | $13,073 | 73 | $5,194 | 625 | $8,295 | - | $233 | - | $(-408) | - | $4,000 | - | $21,984 610,012 kWh |
$13,073 73 kW-months/year |
$5,194 625 MMBtu |
$8,295 - Tgal |
$233 - lb |
$(-408) - $ |
$4,000 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | lb | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Solid Waste (haz) | Personnel Changes | Administrative Changes | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Solid Waste (haz) | Personnel Changes | Administrative Changes |