Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | West Virginia University |
---|---|
Assessment Year | 2004 |
Principal Product | Metal Stampings |
NAICS | 332119 - Metal Crown, Closure, and Other Metal Stamping (except Automotive) |
SIC | 3469 - Metal Stampings, Nec |
Sales | $5,000,000-$10,000,000 |
# of Employees | 34 |
Plant Area (Sq.Ft.) | 70,000 |
Annual Production | 3,500 Tons |
Production Hrs. Annual | 4,368 |
Location (State) | OH |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $45,638 | 1,346,356 | kWh | $0.03 |
Electricity Demand | $54,288 | 4,427 | kW-months/year | $12.26 |
Electricity Fees | $1,813 | - | $ | - |
Natural Gas | $25,687 | 2,561 | MMBtu | $10.03 |
TOTAL ENERGY COSTS | $127,426 | |||
RECOMMENDED SAVINGS* | $62,491 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $57,328 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Solid Waste (non-haz) | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | $ | $ | MMBtu | $ | lb | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $4,584 Cost: $3,731 |
$2,344 | 66,486 | $2,240 | 183 | - | - | - | - | - | - | - | - |
$2,344 66,486 kWh |
$2,240 183 kW-months/year |
- - $ |
- - MMBtu |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER |
Savings: $3,141 Cost: - |
- | - | $8,141 | 664 | $(-5,000) | - | - | - | - | - | - | - |
- - kWh |
$8,141 664 kW-months/year |
$(-5,000) - $ |
- - MMBtu |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $3,134 Cost: $292 |
$1,601 | 45,489 | $1,533 | 125 | - | - | - | - | - | - | - | - |
$1,601 45,489 kWh |
$1,533 125 kW-months/year |
- - $ |
- - MMBtu |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $3,072 Cost: $7,735 |
$1,356 | 38,454 | $1,716 | 140 | - | - | - | - | - | - | - | - |
$1,356 38,454 kWh |
$1,716 140 kW-months/year |
- - $ |
- - MMBtu |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2614 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING |
Savings: $3,067 Cost: $7,050 |
$2,025 | 57,428 | $1,042 | 85 | - | - | - | - | - | - | - | - |
$2,025 57,428 kWh |
$1,042 85 kW-months/year |
- - $ |
- - MMBtu |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $3,066 Cost: $2,200 |
$1,570 | 44,536 | $1,496 | 122 | - | - | - | - | - | - | - | - |
$1,570 44,536 kWh |
$1,496 122 kW-months/year |
- - $ |
- - MMBtu |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES |
Savings: $2,889 Cost: $80 |
$1,477 | 41,933 | $1,412 | 115 | - | - | - | - | - | - | - | - |
$1,477 41,933 kWh |
$1,412 115 kW-months/year |
- - $ |
- - MMBtu |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $2,260 Cost: $50 |
$1,157 | 32,732 | $1,103 | 90 | - | - | - | - | - | - | - | - |
$1,157 32,732 kWh |
$1,103 90 kW-months/year |
- - $ |
- - MMBtu |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.7492 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE |
Savings: $2,096 Cost: $1,967 |
- | - | - | - | - | - | $2,096 | 209 | - | - | - | - |
- - kWh |
- - kW-months/year |
- - $ |
$2,096 209 MMBtu |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $921 Cost: $1,400 |
$471 | 13,349 | $450 | 37 | - | - | - | - | - | - | - | - |
$471 13,349 kWh |
$450 37 kW-months/year |
- - $ |
- - MMBtu |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 2.4151 DEVELOP A REPAIR/REPLACE POLICY |
Savings: $731 Cost: $300 |
$375 | 10,548 | $356 | 29 | - | - | - | - | - | - | - | - |
$375 10,548 kWh |
$356 29 kW-months/year |
- - $ |
- - MMBtu |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY |
Savings: $28,080 Cost: $100 |
- | - | - | - | - | - | - | - | $28,080 | - | - | - |
- - kWh |
- - kW-months/year |
- - $ |
- - MMBtu |
$28,080 - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
13: 2.6221 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY |
Savings: $5,450 Cost: $5,000 |
- | - | - | - | - | - | - | - | - | - | $5,450 | - |
- - kWh |
- - kW-months/year |
- - $ |
- - MMBtu |
- - lb |
$5,450 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $62,491 Cost: $29,905 |
$12,376 | 350,955 | $19,489 | 1,590 | $(-5,000) | - | $2,096 | 209 | $28,080 | - | $5,450 | - | $12,376 350,955 kWh |
$19,489 1,590 kW-months/year |
$(-5,000) - $ |
$2,096 209 MMBtu |
$28,080 - lb |
$5,450 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $57,328 Cost: $20,888 |
$10,351 | 293,527 | $18,447 | 1,505 | $(-5,000) | - | - | - | $28,080 | - | $5,450 | - | $10,351 293,527 kWh |
$18,447 1,505 kW-months/year |
$(-5,000) - $ |
- - MMBtu |
$28,080 - lb |
$5,450 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | $ | $ | MMBtu | $ | lb | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Solid Waste (non-haz) | Personnel Changes |