Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

41

matching recommendations
Reset
NAICS 1151 Support Activities for Crop Production
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0480 # 02 Y:2016 02 2016 TURN OFF EQUIPMENT WHEN NOT IN USE $187 $0 Implemented
SF0480 # 03 Y:2016 03 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,403 $354 Implemented
SF0480 # 04 Y:2016 04 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,097 $219 Implemented
SF0480 # 08 Y:2016 08 2016 INSTALL OCCUPANCY SENSORS $6,041 $31,062 Implemented
SF0480 # 09 Y:2016 09 2016 USE SOLAR HEAT TO MAKE ELECTRICTY $96,947 $904,867 Implemented
SF0480 # 01 Y:2016 01 2016 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $2,228 $0 Implemented
SF0440 # 04 Y:2013 04 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,854 $11,795 Implemented
SF0440 # 02 Y:2013 02 2013 INSTALL OCCUPANCY SENSORS $4,352 $6,354 Implemented
SF0440 # 01 Y:2013 01 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $212,131 $19,224 Implemented
SF0440 # 05 Y:2013 05 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,122 $41,610 Implemented
SF0440 # 03 Y:2013 03 2013 UPGRADE CONTROLS ON COMPRESSORS $10,575 $16,520 Implemented
SF0440 # 08 Y:2013 08 2013 ELIMINATE LEAKS IN WATER LINES AND VALVES $11,533 $66,403 Implemented
SF0440 # 06 Y:2013 06 2013 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $40,388 $27,000 Implemented
SF0376 # 03 Y:2009 03 2009 INSTALL OCCUPANCY SENSORS $2,011 $6,725 Implemented
SF0376 # 02 Y:2009 02 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $34,155 $110,307 Implemented
SF0376 # 01 Y:2009 01 2009 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $397 $535 Implemented
SF0376 # 04 Y:2009 04 2009 AVOID FROST FORMATION ON EVAPORATORS $2,865 $9,600 Implemented
SF0376 # 05 Y:2009 05 2009 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $17,149 $75,000 Implemented
SF0339 # 01 Y:2007 01 2007 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $105,374 $0 Implemented
SF0339 # 03 Y:2007 03 2007 INSTALL OCCUPANCY SENSORS $2,186 $1,188 Implemented
SF0339 # 04 Y:2007 04 2007 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,752 $1,890 Implemented
SF0339 # 05 Y:2007 05 2007 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $20,827 $26,019 Implemented
SF0339 # 06 Y:2007 06 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,067 $10,458 Implemented
SF0339 # 07 Y:2007 07 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,202 $14,292 Implemented
SF0338 # 13 Y:2007 13 2007 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $58,477 $704,893 Implemented