IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

213

matching recommendations
Reset
NAICS 212 Mining (except Oil and Gas)
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0781 # 03 Y:2023 03 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $618 $2,576 n/a
OR0781 # 04 Y:2023 04 2023 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $486,797 $4,030,000 n/a
OR0781 # 01 Y:2023 01 2023 ELIMINATE/REDUCE AN OPERATION $112,997 $116,429 n/a
OR0781 # 02 Y:2023 02 2023 OPTIMIZE PLANT POWER FACTOR $3,665 $20,839 n/a
LE0550 # 04 Y:2023 04 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $299 $1,150 Not Implemented
LE0550 # 06 Y:2023 06 2023 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $4,500 $22,000 Not Implemented
LE0550 # 01 Y:2023 01 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,663 $100 Implemented
LE0550 # 02 Y:2023 02 2023 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $1,474 $2,500 Implemented
LE0550 # 05 Y:2023 05 2023 ELIMINATE A BY-PRODUCT $85,450 $350,000 Implemented
LE0550 # 03 Y:2023 03 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,539 $3,500 Implemented
LE0550 # 07 Y:2023 07 2023 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $5,791 $34,566 Implemented
UU0193 # 05 Y:2022 05 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,875 $5,000 Implemented
UU0193 # 06 Y:2022 06 2022 INSTALL OCCUPANCY SENSORS $946 $3,500 Not Implemented
UU0193 # 04 Y:2022 04 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,736 $1,307 Implemented
UU0193 # 02 Y:2022 02 2022 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $371,933 $40,000 Implemented
UU0193 # 03 Y:2022 03 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,764 $4,720 Implemented
UU0193 # 01 Y:2022 01 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $269,225 $7,636,800 Implemented
TT0238 # 01 Y:2020 01 2020 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $28,385 $3,500 Implemented
TT0238 # 05 Y:2020 05 2020 INCREASE EFFICIENCY OF TRUCKS $7,291 $24,565 Not Implemented
TT0238 # 06 Y:2020 06 2020 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $6,836 $1,500 Implemented
TT0238 # 07 Y:2020 07 2020 INSTALL / REPAIR INSULATION ON STEAM LINES $1,527 $350 Implemented
TT0238 # 04 Y:2020 04 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $10,965 $22,780 Implemented
TT0238 # 03 Y:2020 03 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $13,222 $25,000 Not Implemented
TT0238 # 02 Y:2020 02 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,091 $75,890 Implemented
TT0238 # 08 Y:2020 08 2020 TURN OFF EQUIPMENT WHEN NOT IN USE $511 $40 Implemented