IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

32

matching recommendations
Reset
NAICS 212 Mining (except Oil and Gas)
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0730 # 01 Y:2019 01 2019 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES $15,651 $5,000 Not Implemented
OR0730 # 02 Y:2019 02 2019 MODIFY WORKLOAD $13,223 $18,824 Not Implemented
OR0730 # 03 Y:2019 03 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,201 $0 Not Implemented
OR0730 # 04 Y:2019 04 2019 OPTIMIZE PLANT POWER FACTOR $2,657 $9,364 Not Implemented
OR0730 # 05 Y:2019 05 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,030 $2,058 Not Implemented
WM0138 # 07 Y:2019 07 2019 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $4,770 $0 Not Implemented
WM0138 # 06 Y:2019 06 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $6,375 $11,900 Implemented
WM0138 # 05 Y:2019 05 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,068 $14,525 Not Implemented
WM0138 # 04 Y:2019 04 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,430 $30,453 Implemented
WM0138 # 03 Y:2019 03 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $25,347 $29,120 Not Implemented
WM0138 # 01 Y:2019 01 2019 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $336,174 $82,000 Not Implemented
WM0138 # 02 Y:2019 02 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $31,481 $34,315 Implemented
SU0478 # 01 Y:2019 01 2019 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $2,670 $260 Not Implemented
SU0478 # 04 Y:2019 04 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $385 $528 Implemented
SU0478 # 02 Y:2019 02 2019 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $468 $253 Not Implemented
SU0478 # 06 Y:2019 06 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,321 $75,548 Implemented
SU0478 # 03 Y:2019 03 2019 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,685 $1,302 Not Implemented
SU0478 # 05 Y:2019 05 2019 INSTALL OCCUPANCY SENSORS $1,130 $1,973 Not Implemented
SU0478 # 07 Y:2019 07 2019 OPTIMIZE PLANT POWER FACTOR $29,408 $113,315 Not Implemented
UU0148 # 01 Y:2019 01 2019 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $4,526,086 $11,242,113 Not Implemented
UU0148 # 02 Y:2019 02 2019 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $292,277 $82,400 Implemented
UU0148 # 03 Y:2019 03 2019 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $205,559 $25,240 Implemented
UU0148 # 04 Y:2019 04 2019 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE $21,723 $100,000 Not Implemented
UU0148 # 05 Y:2019 05 2019 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $10,445 $308 Not Implemented
UU0148 # 06 Y:2019 06 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,667 $8,267 Implemented