Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
22
matching recommendationsNAICS | 212234 | Copper Ore and Nickel Ore Mining |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MU0052 # 02 Y:2024 | 02 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $337 | $17 | n/a |
MU0052 # 03 Y:2024 | 03 | 2024 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $508 | $1,752 | n/a |
MU0052 # 04 Y:2024 | 04 | 2024 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $150 | $400 | n/a |
MU0052 # 05 Y:2024 | 05 | 2024 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,186 | $0 | n/a |
MU0052 # 06 Y:2024 | 06 | 2024 | USE PHOTOCELL CONTROLS | $84 | $225 | n/a |
MU0052 # 07 Y:2024 | 07 | 2024 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $6,376 | $10,087 | n/a |
MU0052 # 08 Y:2024 | 08 | 2024 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $14,663 | $5,697 | n/a |
MU0052 # 09 Y:2024 | 09 | 2024 | PAY BILLS ON TIME TO AVOID LATE FEES | $9,940 | $0 | n/a |
MU0052 # 01 Y:2024 | 01 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $15,133 | $0 | n/a |
UU0193 # 06 Y:2022 | 06 | 2022 | INSTALL OCCUPANCY SENSORS | $946 | $3,500 | Not Implemented |
UU0193 # 05 Y:2022 | 05 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,875 | $5,000 | Implemented |
UU0193 # 04 Y:2022 | 04 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,736 | $1,307 | Implemented |
UU0193 # 03 Y:2022 | 03 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,764 | $4,720 | Implemented |
UU0193 # 02 Y:2022 | 02 | 2022 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $371,933 | $40,000 | Implemented |
UU0193 # 01 Y:2022 | 01 | 2022 | USE SOLAR HEAT TO MAKE ELECTRICTY | $269,225 | $7,636,800 | Implemented |
UU0145 # 07 Y:2019 | 07 | 2019 | USE PHOTOCELL CONTROLS | $661 | $440 | Implemented |
UU0145 # 06 Y:2019 | 06 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,250 | $4,719 | Implemented |
UU0145 # 05 Y:2019 | 05 | 2019 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $25,041 | $5,000 | Not Implemented |
UU0145 # 04 Y:2019 | 04 | 2019 | UPGRADE CONTROLS ON COMPRESSORS | $47,010 | $23,850 | Not Implemented |
UU0145 # 03 Y:2019 | 03 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $68,566 | $36,000 | Implemented |
UU0145 # 02 Y:2019 | 02 | 2019 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $373,488 | $10,000 | Not Implemented |
UU0145 # 01 Y:2019 | 01 | 2019 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $377,567 | $872,000 | Not Implemented |