IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

22

matching recommendations
Reset
NAICS 212234 Copper Ore and Nickel Ore Mining
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MU0052 # 02 Y:2024 02 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $337 $17 n/a
MU0052 # 03 Y:2024 03 2024 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $508 $1,752 n/a
MU0052 # 04 Y:2024 04 2024 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $150 $400 n/a
MU0052 # 05 Y:2024 05 2024 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,186 $0 n/a
MU0052 # 06 Y:2024 06 2024 USE PHOTOCELL CONTROLS $84 $225 n/a
MU0052 # 07 Y:2024 07 2024 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $6,376 $10,087 n/a
MU0052 # 08 Y:2024 08 2024 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $14,663 $5,697 n/a
MU0052 # 09 Y:2024 09 2024 PAY BILLS ON TIME TO AVOID LATE FEES $9,940 $0 n/a
MU0052 # 01 Y:2024 01 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $15,133 $0 n/a
UU0193 # 06 Y:2022 06 2022 INSTALL OCCUPANCY SENSORS $946 $3,500 Not Implemented
UU0193 # 05 Y:2022 05 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,875 $5,000 Implemented
UU0193 # 04 Y:2022 04 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,736 $1,307 Implemented
UU0193 # 03 Y:2022 03 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,764 $4,720 Implemented
UU0193 # 02 Y:2022 02 2022 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $371,933 $40,000 Implemented
UU0193 # 01 Y:2022 01 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $269,225 $7,636,800 Implemented
UU0145 # 07 Y:2019 07 2019 USE PHOTOCELL CONTROLS $661 $440 Implemented
UU0145 # 06 Y:2019 06 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,250 $4,719 Implemented
UU0145 # 05 Y:2019 05 2019 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $25,041 $5,000 Not Implemented
UU0145 # 04 Y:2019 04 2019 UPGRADE CONTROLS ON COMPRESSORS $47,010 $23,850 Not Implemented
UU0145 # 03 Y:2019 03 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $68,566 $36,000 Implemented
UU0145 # 02 Y:2019 02 2019 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $373,488 $10,000 Not Implemented
UU0145 # 01 Y:2019 01 2019 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $377,567 $872,000 Not Implemented