Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
178
matching recommendationsNAICS | 2123 | Nonmetallic Mineral Mining and Quarrying |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AS0599 # 03 Y:2025 | 03 | 2025 | INSTALL BACK-UP EQUIPMENT | $297,917 | $1,360,000 | n/a |
AS0599 # 04 Y:2025 | 04 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,723 | $5,870 | n/a |
AS0599 # 01 Y:2025 | 01 | 2025 | BURN A LESS EXPENSIVE GRADE OF FUEL | $625,275 | $321,478 | n/a |
AS0599 # 02 Y:2025 | 02 | 2025 | REDESIGN PROCESS | $778,933 | $500,000 | n/a |
OR0781 # 04 Y:2023 | 04 | 2023 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $486,797 | $4,030,000 | Not Implemented |
OR0781 # 02 Y:2023 | 02 | 2023 | OPTIMIZE PLANT POWER FACTOR | $3,665 | $20,839 | Not Implemented |
OR0781 # 03 Y:2023 | 03 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $618 | $2,576 | Implemented |
OR0781 # 01 Y:2023 | 01 | 2023 | ELIMINATE/REDUCE AN OPERATION | $112,997 | $116,429 | Not Implemented |
LE0550 # 01 Y:2023 | 01 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,663 | $100 | Implemented |
LE0550 # 07 Y:2023 | 07 | 2023 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $5,791 | $34,566 | Implemented |
LE0550 # 06 Y:2023 | 06 | 2023 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $4,500 | $22,000 | Not Implemented |
LE0550 # 05 Y:2023 | 05 | 2023 | ELIMINATE A BY-PRODUCT | $85,450 | $350,000 | Implemented |
LE0550 # 02 Y:2023 | 02 | 2023 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $1,474 | $2,500 | Implemented |
LE0550 # 04 Y:2023 | 04 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $299 | $1,150 | Not Implemented |
LE0550 # 03 Y:2023 | 03 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,539 | $3,500 | Implemented |
TT0238 # 02 Y:2020 | 02 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $19,091 | $75,890 | Implemented |
TT0238 # 01 Y:2020 | 01 | 2020 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $28,385 | $3,500 | Implemented |
TT0238 # 03 Y:2020 | 03 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $13,222 | $25,000 | Not Implemented |
TT0238 # 08 Y:2020 | 08 | 2020 | TURN OFF EQUIPMENT WHEN NOT IN USE | $511 | $40 | Implemented |
TT0238 # 04 Y:2020 | 04 | 2020 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $10,965 | $22,780 | Implemented |
TT0238 # 06 Y:2020 | 06 | 2020 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $6,836 | $1,500 | Implemented |
TT0238 # 05 Y:2020 | 05 | 2020 | INCREASE EFFICIENCY OF TRUCKS | $7,291 | $24,565 | Not Implemented |
TT0238 # 07 Y:2020 | 07 | 2020 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,527 | $350 | Implemented |
OR0730 # 04 Y:2019 | 04 | 2019 | OPTIMIZE PLANT POWER FACTOR | $2,657 | $9,364 | Not Implemented |
OR0730 # 01 Y:2019 | 01 | 2019 | OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES | $15,651 | $5,000 | Not Implemented |