IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

29

matching recommendations
Reset
NAICS 21231 Stone Mining and Quarrying
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WM0072 # 02 Y:2015 02 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,865 $3,846 Implemented
WM0072 # 03 Y:2015 03 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,288 $6,900 Implemented
WM0072 # 04 Y:2015 04 2015 INSTALL OCCUPANCY SENSORS $1,227 $575 Implemented
WM0072 # 05 Y:2015 05 2015 RECOVER WASTE HEAT FROM EQUIPMENT $1,054 $1,390 Not Implemented
WM0072 # 06 Y:2015 06 2015 INSTALL OCCUPANCY SENSORS $221 $476 Not Implemented
WM0072 # 01 Y:2015 01 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,713 $20,000 Not Implemented
SF0467 # 07 Y:2015 07 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $32,647 $223,755 Implemented
SF0467 # 06 Y:2015 06 2015 INSTALL OCCUPANCY SENSORS $522 $2,846 Implemented
SF0467 # 05 Y:2015 05 2015 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,388 $5,977 Implemented
SF0467 # 04 Y:2015 04 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $6,324 $4,543 Implemented
SF0467 # 03 Y:2015 03 2015 INSULATE BARE EQUIPMENT $12,922 $8,500 Not Implemented
SF0467 # 02 Y:2015 02 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,437 $0 Implemented
SF0467 # 01 Y:2015 01 2015 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $3,119 $0 Implemented
TT0042 # 01 Y:2009 01 2009 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $38,600 $28,400 Implemented
TT0042 # 02 Y:2009 02 2009 RECOVER WASTE HEAT FROM EQUIPMENT $16,800 $2,900 Implemented
TT0042 # 03 Y:2009 03 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,430 $20,000 Not Implemented
IC0133 # 04 Y:2007 04 2007 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $20,000 $0 Implemented
IC0133 # 03 Y:2007 03 2007 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $7,116 $22,551 Not Implemented
IC0133 # 02 Y:2007 02 2007 ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE $22,188 $0 Implemented
IC0133 # 01 Y:2007 01 2007 $181,608 $3,876 Not Implemented
SD0384 # 01 Y:2006 01 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $199,400 $80,665 Not Implemented
SD0384 # 02 Y:2006 02 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $184,174 $85,865 Not Implemented
SD0384 # 03 Y:2006 03 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $115,354 $45,825 Not Implemented
SD0384 # 04 Y:2006 04 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $20,082 $13,481 Not Implemented
SD0384 # 05 Y:2006 05 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,401 $0 Not Implemented