IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

105

matching recommendations
Reset
NAICS 221 Utilities
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK1058 # 04 Y:2021 04 2021 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $185 $700 Implemented
OK1058 # 03 Y:2021 03 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,252 $7,778 Implemented
SF0576 # 05 Y:2021 05 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,882 $28,653 Implemented
SF0576 # 06 Y:2021 06 2021 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $41,072 $554,541 Implemented
SF0576 # 02 Y:2021 02 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,886 $120 Implemented
SF0576 # 04 Y:2021 04 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,261 $17,288 Implemented
SF0576 # 03 Y:2021 03 2021 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $12,092 $14,612 Implemented
OK1056 # 03 Y:2021 03 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $425 $629 Implemented
SD0617 # 01 Y:2021 01 2021 UPGRADE OBSOLETE EQUIPMENT $387,076 $608,562 Implemented
SD0617 # 02 Y:2021 02 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $101,052 $3,024,848 Implemented
OK1056 # 04 Y:2021 04 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $46 $162 Implemented
SD0617 # 03 Y:2021 03 2021 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $27,764 $41,000 Implemented
UA0244 # 01 Y:2021 01 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,477 $3,209 Implemented
UF0568 # 03 Y:2021 03 2021 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $11,182 $12,247 Implemented
UF0568 # 05 Y:2021 05 2021 INSTALL OCCUPANCY SENSORS $3,117 $9,240 Implemented
UF0568 # 02 Y:2021 02 2021 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $20,147 $49,165 Implemented
UF0568 # 09 Y:2021 09 2021 LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS $3,655 $0 Implemented
UF0567 # 08 Y:2021 08 2021 LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS $5,867 $0 Implemented
UF0567 # 01 Y:2021 01 2021 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $123,727 $246,613 Implemented
UF0567 # 02 Y:2021 02 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $95,985 $228,343 Implemented
UF0567 # 04 Y:2021 04 2021 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $9,372 $14,250 Implemented
UF0567 # 03 Y:2021 03 2021 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $42,803 $42,764 Implemented
AM0828 # 06 Y:2021 06 2021 USE SYNTHETIC LUBRICANT $1,400 $660 Implemented
AM0828 # 05 Y:2021 05 2021 INSTALL OCCUPANCY SENSORS $1,530 $1,360 Implemented
AM0828 # 01 Y:2021 01 2021 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $26,110 $1,050 Implemented