IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

29

matching recommendations
Reset
NAICS 221 Utilities
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0542 # 01 Y:2019 01 2019 RECOVER MECHANICAL ENERGY $21,606 $120,000 Implemented
UF0542 # 02 Y:2019 02 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $33,764 $60,608 Implemented
UF0542 # 03 Y:2019 03 2019 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $40,073 $72,054 Implemented
UF0540 # 06 Y:2019 06 2019 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $18,214 $25,600 Implemented
UF0540 # 05 Y:2019 05 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $16,996 $0 Implemented
UF0540 # 04 Y:2019 04 2019 INSTALL OCCUPANCY SENSORS $32,246 $1,280 Implemented
UF0540 # 03 Y:2019 03 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $35,477 $20,256 Implemented
UF0540 # 02 Y:2019 02 2019 BURN A LESS EXPENSIVE GRADE OF FUEL $99,716 $392,375 Implemented
UF0540 # 01 Y:2019 01 2019 INSULATE BARE EQUIPMENT $128,693 $34,812 Implemented
UF0535 # 01 Y:2019 01 2019 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $35,230 $127,650 Implemented
UF0535 # 02 Y:2019 02 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,527 $0 Implemented
UF0535 # 03 Y:2019 03 2019 INSTALL OCCUPANCY SENSORS $3,486 $3,283 Implemented
UF0535 # 04 Y:2019 04 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,073 $2,563 Implemented
UF0535 # 05 Y:2019 05 2019 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS $2,330 $6,000 Implemented
UF0535 # 06 Y:2019 06 2019 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,344 $1,400 Implemented
MI0358 # 01 Y:2019 01 2019 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $713,110 $8,242,656 Implemented
MI0358 # 08 Y:2019 08 2019 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $320 $1,549 Not Implemented
MI0358 # 02 Y:2019 02 2019 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $478,275 $6,028,646 Implemented
MI0358 # 03 Y:2019 03 2019 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $270,674 $806,400 Implemented
MI0358 # 04 Y:2019 04 2019 ELIMINATE OXYGEN LOSS $85,219 $51,000 Not Implemented
MI0358 # 05 Y:2019 05 2019 MINIMIZE WATER USAGE $77,140 $207,600 Implemented
MI0358 # 06 Y:2019 06 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,962 $18,807 Implemented
MI0358 # 07 Y:2019 07 2019 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,254 $480 Implemented
UF0533 # 05 Y:2019 05 2019 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $1,160 $4,000 Implemented
UF0533 # 04 Y:2019 04 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,617 $472 Implemented