IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

18

matching recommendations
Reset
NAICS 221 Utilities
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0344 # 04 Y:2023 04 2023 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $59,175 $0 Implemented
MZ0344 # 03 Y:2023 03 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $61,110 $32,240 Implemented
MZ0344 # 02 Y:2023 02 2023 INSTALL OCCUPANCY SENSORS $1,547 $1,000 Implemented
MZ0344 # 01 Y:2023 01 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,614 $750 Implemented
MZ0325 # 04 Y:2022 04 2022 MINIMIZE WATER USAGE $50,371 $4,080 Implemented
MZ0325 # 01 Y:2022 01 2022 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $113,192 $0 Implemented
MZ0312 # 05 Y:2021 05 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $720 $1,350 Implemented
MZ0312 # 04 Y:2021 04 2021 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,140 $480 Implemented
MZ0267 # 04 Y:2019 04 2019 RECOVER AND REUSE COOLING WATER $15,813 $73,900 Implemented
MZ0267 # 03 Y:2019 03 2019 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $53,575 $240,000 Implemented
MZ0267 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,711 $4,573 Implemented
MZ0263 # 03 Y:2019 03 2019 OPTIMIZE PLANT POWER FACTOR $2,053 $2,760 Implemented
MZ0263 # 02 Y:2019 02 2019 USE DEMAND CONTROLLER OR LOAD SHEDDER $2,027 $7,760 Implemented
MZ0263 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,735 $2,278 Implemented
MZ0260 # 03 Y:2018 03 2018 INSTALL OCCUPANCY SENSORS $32,450 $7,600 Implemented
MZ0260 # 02 Y:2018 02 2018 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $577 $450 Implemented
MZ0260 # 01 Y:2018 01 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $21,384 $25,688 Implemented
MZ0232 # 03 Y:2017 03 2017 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $8,891 $10,000 Implemented