IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

22

matching recommendations
Reset
NAICS 2211 Electric Power Generation, Transmission and Distribution
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0549 # 04 Y:2020 04 2020 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $492,292 $1,875,550 Not Implemented
UF0549 # 03 Y:2020 03 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,001 $2,904 Implemented
UF0549 # 02 Y:2020 02 2020 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $73,018 $68,138 Not Implemented
UF0549 # 01 Y:2020 01 2020 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $737,260 $2,600,000 Not Implemented
TT0211 # 05 Y:2018 05 2018 USE OPTIMUM TEMPERATURE $67,812 $300,000 Not Implemented
TT0211 # 07 Y:2018 07 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $13,109 $3,750 Implemented
TT0211 # 06 Y:2018 06 2018 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $25,620 $100 Not Implemented
TT0211 # 04 Y:2018 04 2018 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $73,737 $75,000 Not Implemented
TT0211 # 03 Y:2018 03 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $89,245 $600,000 Not Implemented
TT0211 # 02 Y:2018 02 2018 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $96,921 $15,000 Not Implemented
TT0211 # 01 Y:2018 01 2018 FLASH CONDENSATE TO PRODUCE LOWER PRESSURE STEAM $115,103 $150,000 Implemented
OR0579 # 01 Y:2012 01 2012 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $15,066 $0 Implemented
OR0579 # 07 Y:2012 07 2012 USE PHOTOCELL CONTROLS $17,340 $46,680 Implemented
OR0579 # 06 Y:2012 06 2012 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $8,805 $18,596 Not Implemented
OR0579 # 05 Y:2012 05 2012 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $7,281 $12,000 Not Implemented
OR0579 # 04 Y:2012 04 2012 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $2,300 $8,200 Not Implemented
OR0579 # 03 Y:2012 03 2012 SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING $23,346 $55,000 Implemented
OR0579 # 02 Y:2012 02 2012 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $125,819 $198,800 Not Implemented
OR0552 # 01 Y:2009 01 2009 USE STEAM PRESSURE REDUCTION TO GENERATE POWER $517,700 $1,250,000 Not Implemented
OR0552 # 02 Y:2009 02 2009 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $6,900 $20,000 Not Implemented
OR0552 # 03 Y:2009 03 2009 USE DEMAND CONTROLLER OR LOAD SHEDDER $9,900 $7,400 Not Implemented
OR0552 # 04 Y:2009 04 2009 INSTALL OCCUPANCY SENSORS $18,800 $16,200 Not Implemented