Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,324
matching recommendationsNAICS | 2213 | Water, Sewage and Other Systems |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UW2508 # 04 Y:2025 | 04 | 2025 | INSTALL DEDICATED MIXING EQUIP TO OPTIMIZE REUSE OF USED RINSEATE & TO PRECLUDE THE NEED FOR INTER-RUN CLEANING | $116,528 | $582,640 | n/a |
UW2508 # 01 Y:2025 | 01 | 2025 | USE DOUBLE OR TRIPLE GLAZED WINDOWS TO MAINTAIN HIGHER RELATIVE HUMIDITY AND TO REDUCE HEAT LOSSES | $272 | $6,858 | n/a |
UW2508 # 03 Y:2025 | 03 | 2025 | INSTALL OCCUPANCY SENSORS | $841 | $8,448 | n/a |
UW2508 # 02 Y:2025 | 02 | 2025 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $665 | $8,888 | n/a |
UW2507 # 01 Y:2025 | 01 | 2025 | UPGRADE OBSOLETE EQUIPMENT | $170,715 | $5,537,300 | n/a |
UW2507 # 03 Y:2025 | 03 | 2025 | MODIFY FACILITY TO AVOID EXCESS MAINTENANCE COSTS | $5,795 | $10,336 | n/a |
UW2507 # 06 Y:2025 | 06 | 2025 | USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES | $124,957 | $342,000 | n/a |
UW2507 # 02 Y:2025 | 02 | 2025 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $38,542 | $289,575 | n/a |
UW2507 # 04 Y:2025 | 04 | 2025 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $399,297 | $329,940 | n/a |
UW2507 # 05 Y:2025 | 05 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $37,086 | $16,198 | n/a |
SJ0036 # 06 Y:2025 | 06 | 2025 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $39,541 | $0 | n/a |
SJ0036 # 03 Y:2025 | 03 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,847 | $12,868 | n/a |
SJ0036 # 04 Y:2025 | 04 | 2025 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $13,688 | $62,974 | n/a |
SJ0036 # 05 Y:2025 | 05 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,243 | $0 | n/a |
SJ0036 # 02 Y:2025 | 02 | 2025 | USE BATTERY STORAGE FOR DEMAND CONTROL | $7,434 | $51,497 | n/a |
SJ0036 # 01 Y:2025 | 01 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $74,641 | $376,992 | n/a |
UW2502 # 02 Y:2025 | 02 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $332 | $2,872 | n/a |
UW2502 # 03 Y:2025 | 03 | 2025 | INCREASE EFFICIENCY OF TRUCKS | $10,938 | $114,250 | n/a |
UW2502 # 05 Y:2025 | 05 | 2025 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $2,383 | $20,158 | n/a |
UW2502 # 04 Y:2025 | 04 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $5,248 | $31,835 | n/a |
UW2502 # 01 Y:2025 | 01 | 2025 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $2,373 | $13,260 | n/a |
SJ0034 # 04 Y:2025 | 04 | 2025 | USE POWER DURING OFF-PEAK PERIODS | $1,270 | $0 | n/a |
SJ0034 # 01 Y:2025 | 01 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $31,541 | $106,228 | n/a |
SJ0034 # 02 Y:2025 | 02 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $12,631 | $10,962 | n/a |
SJ0034 # 03 Y:2025 | 03 | 2025 | USE OPTIMUM TEMPERATURE | $3,458 | $0 | n/a |