IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

247

matching recommendations
Reset
NAICS 2213 Water, Sewage and Other Systems
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0620 # 07 Y:2024 07 2024 USE BATTERY STORAGE FOR DEMAND CONTROL $511,502 $6,765,825 n/a
SF0620 # 03 Y:2024 03 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $81,460 $95,723 n/a
SF0620 # 06 Y:2024 06 2024 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $1,786,404 $4,187,700 n/a
SF0620 # 02 Y:2024 02 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $39,113 $24,553 n/a
SF0620 # 01 Y:2024 01 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $101,612 $3,840 n/a
SF0620 # 04 Y:2024 04 2024 UPGRADE OBSOLETE EQUIPMENT $11,663 $52,983 n/a
SF0620 # 05 Y:2024 05 2024 UPGRADE OBSOLETE EQUIPMENT $83,597 $429,096 n/a
SF0618 # 07 Y:2024 07 2024 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $9,674 $19,158 n/a
SF0618 # 02 Y:2024 02 2024 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $4,735 $1,500 n/a
SF0618 # 01 Y:2024 01 2024 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,570 $175 n/a
SF0618 # 10 Y:2024 10 2024 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $875 $3,607 n/a
SF0618 # 04 Y:2024 04 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,266 $3,170 n/a
SF0618 # 03 Y:2024 03 2024 INSTALL EQUIPMENT TO UTILIZE WASTE FUEL $705,605 $250,000 n/a
SF0618 # 08 Y:2024 08 2024 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $22,115 $60,335 n/a
SF0618 # 06 Y:2024 06 2024 REDESIGN PROCESS $59,966 $75,700 n/a
SF0618 # 09 Y:2024 09 2024 USE PHOTOCELL CONTROLS $2,561 $10,136 n/a
SF0618 # 05 Y:2024 05 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,359 $2,340 n/a
SF0602 # 02 Y:2023 02 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $15,182 $1,800 Not Implemented
SF0602 # 06 Y:2023 06 2023 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $6,247 $30,019 Implemented
SF0602 # 01 Y:2023 01 2023 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $632 $0 Not Implemented
SF0602 # 03 Y:2023 03 2023 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $8,138 $2,126 Not Implemented
SF0602 # 04 Y:2023 04 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $37,571 $47,276 Not Implemented
SF0602 # 05 Y:2023 05 2023 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $31,205 $105,364 Not Implemented
SF0599 # 02 Y:2023 02 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $49,633 $13,122 Implemented
SF0599 # 01 Y:2023 01 2023 TURN OFF EQUIPMENT WHEN NOT IN USE $8,702 $0 Implemented