IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,253

matching recommendations
Reset
NAICS 2213 Water, Sewage and Other Systems
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0283 # 03 Y:2023 03 2023 USE SOLAR HEAT FOR HEAT $25,272 $88,025 Not Implemented
OR0760 # 01 Y:2023 01 2023 ELIMINATE/REDUCE AN OPERATION $3,852 $0 Implemented
OR0760 # 02 Y:2023 02 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,420 $4,344 Implemented
OR0760 # 03 Y:2023 03 2023 USE STEAM PRESSURE REDUCTION TO GENERATE POWER $112,516 $735,625 Implemented
WV0634 # 01 Y:2022 01 2022 CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS $45,174 $141,500 Not Implemented
WV0634 # 02 Y:2022 02 2022 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $12,909 $43,000 Not Implemented
WV0634 # 03 Y:2022 03 2022 INSTALL OCCUPANCY SENSORS $8,882 $8,985 Implemented
WV0634 # 04 Y:2022 04 2022 DEVELOP A REPAIR/REPLACE POLICY $1,166 $1,633 Implemented
WV0634 # 05 Y:2022 05 2022 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $973 $1,500 Implemented
WV0634 # 06 Y:2022 06 2022 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $214 $908 Implemented
NL0073 # 01 Y:2022 01 2022 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $16,217 $225,000 Implemented
NL0073 # 02 Y:2022 02 2022 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $7,537 $35,000 Implemented
NL0073 # 03 Y:2022 03 2022 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $5,239 $1,398 Not Implemented
NL0073 # 04 Y:2022 04 2022 USE OTHER WASTE CONCENTRATION METHODS $1,144 $1,258 Implemented
NL0073 # 05 Y:2022 05 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $772 $58 Implemented
CO0745 # 01 Y:2022 01 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $1,180 $0 n/a
CO0745 # 02 Y:2022 02 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,752 $0 n/a
CO0745 # 03 Y:2022 03 2022 USE OPTIMUM TEMPERATURE $10,067 $0 n/a
CO0745 # 04 Y:2022 04 2022 USE SOLAR HEAT FOR HEAT $75,255 $445,900 n/a
WV0633 # 01 Y:2022 01 2022 CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS $14,598 $23,000 Not Implemented
WV0633 # 02 Y:2022 02 2022 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $13,775 $16,600 Not Implemented
WV0633 # 03 Y:2022 03 2022 DIRECT WASTE GASSES TO BOILER COMBUSTION AIR $4,724 $12,236 Not Implemented
WV0633 # 04 Y:2022 04 2022 LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT $4,626 $4,080 Not Implemented
WV0633 # 05 Y:2022 05 2022 INSTALL OCCUPANCY SENSORS $2,533 $1,543 Implemented
WV0633 # 06 Y:2022 06 2022 LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT $1,637 $5,130 Not Implemented