Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
78
matching recommendationsNAICS | 2213 | Water, Sewage and Other Systems |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UU0183 # 03 Y:2021 | 03 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $100,049 | $157,500 | Not Implemented |
UU0183 # 08 Y:2021 | 08 | 2021 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $794 | $1,175 | Not Implemented |
UU0174 # 05 Y:2021 | 05 | 2021 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $476 | $1,925 | Not Implemented |
UU0174 # 04 Y:2021 | 04 | 2021 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $744 | $200 | Implemented |
UU0174 # 03 Y:2021 | 03 | 2021 | INSTALL OCCUPANCY SENSORS | $5,107 | $43,420 | Not Implemented |
UU0174 # 02 Y:2021 | 02 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $18,383 | $85,347 | Implemented |
UU0174 # 01 Y:2021 | 01 | 2021 | INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) | $24,060 | $178,852 | Implemented |
UU0169 # 04 Y:2020 | 04 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $514 | $2,100 | Implemented |
UU0169 # 03 Y:2020 | 03 | 2020 | USE OPTIMUM TEMPERATURE | $4,303 | $0 | Implemented |
UU0169 # 01 Y:2020 | 01 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $39,976 | $124,680 | Implemented |
UU0169 # 02 Y:2020 | 02 | 2020 | USE EXISTING DAM TO GENERATE ELECTRICITY | $24,451 | $120,000 | Not Implemented |
UU0168 # 01 Y:2020 | 01 | 2020 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $5,906 | $0 | Implemented |
UU0168 # 02 Y:2020 | 02 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,729 | $15,550 | Implemented |
UU0168 # 03 Y:2020 | 03 | 2020 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $3,221 | $8,000 | Not Implemented |
UU0168 # 04 Y:2020 | 04 | 2020 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $3,063 | $0 | Implemented |
UU0168 # 05 Y:2020 | 05 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $251 | $0 | Implemented |
UU0168 # 06 Y:2020 | 06 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $178 | $0 | Implemented |
UU0164 # 03 Y:2020 | 03 | 2020 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $865 | $2,038 | Not Implemented |
UU0164 # 01 Y:2020 | 01 | 2020 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $4,252 | $2,000 | Not Implemented |
UU0164 # 05 Y:2020 | 05 | 2020 | USE RADIANT HEATER FOR SPOT HEATING | $245 | $540 | Not Implemented |
UU0164 # 04 Y:2020 | 04 | 2020 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $750 | $750 | Not Implemented |
UU0164 # 02 Y:2020 | 02 | 2020 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,660 | $500 | Not Implemented |
UU0163 # 07 Y:2020 | 07 | 2020 | ADOPT IN-HOUSE MATERIAL GENERATION | $10,477 | $5,000 | Implemented |
UU0163 # 06 Y:2020 | 06 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,414 | $15,055 | Implemented |
UU0163 # 05 Y:2020 | 05 | 2020 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $4,576 | $2,000 | Implemented |