Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

184

matching recommendations
Reset
NAICS 2213 Water, Sewage and Other Systems
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0571 # 04 Y:2022 04 2022 INSTALL OCCUPANCY SENSORS $4,673 $5,569 Implemented
UF0570 # 09 Y:2022 09 2022 LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS $7,481 $0 Implemented
UF0570 # 08 Y:2022 08 2022 AUTOMATE FINISHING PROCESS $17,264 $3,564 Not Implemented
UF0570 # 07 Y:2022 07 2022 LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT $63,448 $10,000 Implemented
UF0570 # 06 Y:2022 06 2022 INSTALL OCCUPANCY SENSORS $4,026 $12,390 Not Implemented
UF0570 # 05 Y:2022 05 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,674 $35,369 Implemented
UF0570 # 04 Y:2022 04 2022 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $12,034 $32,610 Implemented
UF0570 # 03 Y:2022 03 2022 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $12,945 $20,214 Implemented
UF0570 # 02 Y:2022 02 2022 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $15,702 $33,667 Implemented
UF0570 # 01 Y:2022 01 2022 USE DEMAND CONTROLLER OR LOAD SHEDDER $61,494 $87,677 Implemented
UF0568 # 09 Y:2021 09 2021 LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS $3,655 $0 Implemented
UF0568 # 08 Y:2021 08 2021 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $8,760 $8,000 Not Implemented
UF0568 # 07 Y:2021 07 2021 REUSE / RECYCLE/ SELL PAPER PRODUCTS $1,670,260 $53,000 Not Implemented
UF0568 # 06 Y:2021 06 2021 REDESIGN FLOW TO MINIMIZE MASS TRANSFER LENGTH $1,828 $0 Not Implemented
UF0568 # 05 Y:2021 05 2021 INSTALL OCCUPANCY SENSORS $3,117 $9,240 Implemented
UF0568 # 04 Y:2021 04 2021 CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS $8,146 $700 Not Implemented
UF0568 # 03 Y:2021 03 2021 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $11,182 $12,247 Implemented
UF0568 # 02 Y:2021 02 2021 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $20,147 $49,165 Implemented
UF0568 # 01 Y:2021 01 2021 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $52,474 $147,852 Not Implemented
UF0567 # 08 Y:2021 08 2021 LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS $5,867 $0 Implemented
UF0567 # 01 Y:2021 01 2021 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $123,727 $246,613 Implemented
UF0567 # 02 Y:2021 02 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $95,985 $228,343 Implemented
UF0567 # 03 Y:2021 03 2021 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $42,803 $42,764 Implemented
UF0567 # 04 Y:2021 04 2021 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $9,372 $14,250 Implemented
UF0567 # 07 Y:2021 07 2021 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $8,760 $8,000 Not Implemented